Back to CV list
Jude Ifeanyi
Personal data and contacts will be open only to employers with access to CV database
Access support engineer 350 000
Job Type: Full-Time , open to relocation

Education

From 0 to 2006
Federal University of Technology, Owerri
No added languages

Experience

Transmission Engineer.
Tusen consulting
November 2008 - Present Day (8 years 7 months)

 Supervises sub-contractors on operation and maintenance of etisalat network in Oyo state.

 Maintains and improves Etisalat Network in Oyo State.

 Provides technical support to sub contractors on fault resolution.

 Proffer solutions to repetitive transmission network faults affecting network quality and availability

 Strives to ensure ninety nine point nine percent (99.9%) network availability as enshrined in the service level agreement.

 Provides an interface between the management, Customer and subcontractors on the best way to improve network.

 Manages a team of about fifty engineers (power and telecom combined).

 Ensures that all preventive, corrective and configuration Work Orders/ Change Requests are duly implemented and according to the Work Order/ Change Request process

 Maintains comprehensive records of all transmission links

 BTS upgrading/downgrading.

 BTS commissioning/re-commissioning (offline or online).

 Link commissioning/decommissioning.

 Involved in cut-over activities of PS and CS between Benin BSC and Ugheli BSC.

 Involved in cut-over of Atermux links of UGBL07 to Benin MGW.

 Transferred twenty sites from UGBL07 to UGBL36.

 Maintained Node b (3G) sites of Etisalat links in Edo/Delta.

 Maintains comprehensive records of all transmission links within my cluster.

 Prepares and compiles reports on works executed and access transmission links in light of existing Service Level Agreements (SLAs) and send same to the management.

 Perform any other duties assigned by the Management.

Perform operation and maintenance of access, transmission and power elements to achieve network availability.

Installer
Dammac Global Resources
November 2007 - October 2008 (11 months)

 Installation, configuration and commissioning of microwave Radios.

 Installation of RF and BTS equipment.

 BTS commissioning.

 Network routing/Integration.

 Site/link upgrading and downgrading

 Test of PSU, cable laying and termination.