Back to CV list
AKINWANDE
Personal data and contacts will be open only to employers with access to CV database
Asst. project manager
Job Type: Full-Time

Education

From 0 to 2008
UNIBEN
No added languages

Experience

ASST PROJECT MANAGER
SMITHCROWN
April 2010 - Present Day (6 years 11 months)

WORK EXPERIENCE

SMITHCROWN NIGERIA LIMITED. Ilupeju, LAGOS

PROJECT WORKS (General Engineering Services: Steel Fabrication, Pipeline, and Civil Construction etc)

Assistant Project Manager: Rice Plant construction 2012

(AVNASH RICE PLANT PROJECT GHANA)

Responsibility

  • Schedule the project in logical steps and budget time required to meet deadlines.
  • Determine labor requirements and dispatch workers to construction sites.
  • Inspect and review projects to monitor compliance with building and safety codes, and other regulations.
  • Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner or developer.
  • Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.
  • Obtain all necessary permits and licenses.
  • Direct and supervise workers.
  • Study job specifications to determine appropriate construction methods.
  • Select, contract, and oversee workers who complete specific pieces of the project, such as painting or plumbing.
  • Requisition supplies and materials to complete construction projects.
  • Prepare and submit budget estimates and progress and cost tracking reports.
  • Develop and implement quality control programs.
  • Take actions to deal with the results of delays, bad weather, or emergencies at construction site.
  • Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.
  • Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, machinery and systems.
  • Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.
  • Evaluate construction methods and determine cost-effectiveness of plans, using computers.





Assistant Project Manager: Installation of steel roof trusses 2012

MM2 Airport hotel and Conference roofing (Completed)

Responsibilities

  • Inspection of steel roof truss installation.
  • Ensuring safety during duties.

Project Engr.: Construction of Warehouse for Sona Group 2012

Songo-Ota (completed)

Responsibilities

  • Installation of Concrete Batching Plant.
  • Inspection of functionality of batching plant.
  • Schedule layout for maintenance of batching plant.
  • Making report on batching plant operation.
  • Coordinate and schedule delivery of all material needed in daily operation and production of ready mix.

Project Engr.: Calibration of Fuel tanks in NIGERIAN BOTTLING COMPANY (Completed) 2011

Responsibilities (Supervisory)

  • Inspection and supervision of staff carrying out calibration
  • Efficient calibration team relocation and supervisory duties.
  • Review and maintaining records of calibration certificates of instruments, personal certification.

Project Engr.: Repair of Steel Tank base (completed) 2011

(LAFARG WAPCO CEMENT EWEKORO DUAL FIRING PROJECT)

Responsibilities

  • Involved in Planning of repair process of tank as per API 653 and API510
  • Involved in Implementing of work schedule
  • Inspection for the repair
  • Attending site meetings

Project Engr: Construction of 7500m3 Steel Storage Tanks (Completed) 2011

(LAFARG WAPCO CEMENT EWEKORO DUAL FIRING PROJECT)

Responsibilities

  • Review of Tank design prepared by consultant.
  • Planning of repair process as per API 653.
  • Verifying all inspection of incoming plates, pipes, gaskets, flanges as per standards and document requirement.
  • Involved in review of welding procedure specification welder qualification as per ASME and client specification.
  • Review of materials and certificates as per Codes.
  • Inspection of fabrication above ground storage tank.
  • Inspection of risk based processes.
  • Inspection of the installation of heaters.
  • Preparing weekly and monthly progress report.
  • Attending of Project progress meetings.
  • Witness hydro and pneumatic-test of tank.
  • Review and maintaining records of calibration certificates of instruments, personal certification.
  • Coordinate and schedule delivery of all materials.
  • Ensure that all documentation of processes necessary to the extent to assure their effective operation.
  • Develop and manage key activity plans for all phases of all projects including contracting using the project database and manage monthly reporting on progress and cost.
  • Carry out preliminary project risk assessment to identify and assess risks and uncertainties associated with important projects and develop risk management plan and mitigation strategies for areas under consideration.

SITE ENGR.: Installation of LPFO pipeline (completed) 2010

Responsibilities

  • Review of piping design prepared by consultant.
  • Welding Inspection and NDT inspection of pipes, pipe fit up and alignment.
  • Preparing weekly and monthly progress report.
  • Witness hydro and pneumatic-test of piping
  • Attending of Project progress meetings.
  • Inspection of the installation of heaters.
  • Inspection of the installation of Valves.
  • Inspection of the installation of insulators.


HENKOLIE INVESTMENT LIMITED. Festac, LAGOS

Site Engr: Everest oil & Gas ltd. 2008

  • Installation of pumps.
  • Supervision of labour.
  • Supervision of NDT on Tanks.
  • Supervision of sand blasting.

Acquitine oil and gas ltd. 2008

  • Supervision of fabrication.
  • Supervision of NDT on tanks.
  • Supervision of sand blasting and painting of tank.



UNIBRIGHT MOTORS. Urubi, EDO 2004

WORKSHOP TECHNICIAN(mechanical)

Duties include:

  • Maintenance & repair of all Peugeot and Toyota vehicle.
  • General workshop safety rules.
  • Use of manual & diagnostic machine to detect fault.
  • Handling of general workshop tools and equipment.
  • Keeps equipment available for use by inspecting and testing vehicles
  • Maintains vehicle functional condition by listening to operator complaints; conducting inspections; repairing engine failures; repairing mechanical and electrical systems malfunctions; replacing parts and components; repairing body damage.
  • Verifies vehicle serviceability by conducting test-drives; adjusting controls and systems.
  • Complies with state vehicle requirements by testing engine, safety, and combustion control standards.
  • Maintains vehicle appearance by cleaning, washing, and painting.
  • Maintains vehicle records by recording service and repairs.
  • Keeps shop equipment operating by following operating instructions; troubleshooting breakdowns; maintaining supplies; performing preventive maintenance; calling for repairs.
  • Contains costs by using warranty; evaluating service and parts options.
  • Keeps supplies ready by inventorying stock, placing orders, verifying receipt.
  • Updates job knowledge by participating in educational opportunities; reading technical publications.