Back to CV list
TAIWO
Personal data and contacts will be open only to employers with access to CV database
Construction technical adviser 280 000
Job Type: Full-Time

Education

From 0 to 2007
FEDERAL UNIVERSITY OF AGRICULTURE,OGUN STATE,NIGERIA
No added languages

Experience

TECHNICAL REP
Kirby building systems
January 2012 - Present Day (5 years 4 months)

Technical supervision and project reporting on FRUIT & NUTTY Factor construction (steel structure), Supplies & installation.

  • Technical Supervision of ORIENTAL FOOD INDUSTRIES steel factories Agbara,Ogun State
  • Quantity Estimation of Construction materials – Granites, Sand, Cement, Water content and the usage of the derived values in the preparation of Bill of Quantities – BOQ.
  • Checking of the Verticality and the Alignment of Structural elements with the emphases on Columns in Frame Structures prior to Block walling or sheet walling
PROJECT ENGINEER
TEEMARC CONSTRUCTION LTD
April 2010 - August 2011 (1 year 5 months)

Construction of a 12km road in Moyamba, Pejuhun and Bothe

In Sierra Leone.

Setting out & Supervision of Construction Activities of 30 units of fully detached & 25 units of semi-detached duplexes on Raft foundation from Substructure - Superstructure to finishing

CIVIL ENGINEER
PLYCON NIGERIA PLC
February 2009 - March 2010 (1 year 1 month)

Technical Supervision and Construction of Government Complex for School for Sight Impaired pupils (Raft Foundation) LAGOS

● Rigid road construction (paving stone) of 2km road at lekki phase 1.Quantity Estimations of all Materials to be used in BEME preparation.

● Rehabilitation of 2.8KM of Roads in Idimu-isheri,Alimosho LGA of Lagos State –ALIMOSHO

● Supervision of 12KM Trapezoidal Drains, coupled with imposed Pre cast Cover Slabs for Pedestrian Work

●Structural Supervision of the Reinforcements to the bases of Aeration tank and the Sedimentation Tank for a 20000g/day Mini Water Works for Lagos State Water Board – LSWB, LAGOS prior to casting of the base at the specified 1:2:4 Mix ratio to receive the imposed Steel Structures.

SITE ENGINEER
STEP DEVELOPMENT LIMITED
August 2008 - February 2009 (6 months)

Setting out, Checking and Supervision of Construction of ZENITH BANK ,Ijesha Branch ,Lagos State

● Supervision and Construction of TOTAL BLENDING PLANT Loading Bay 1&2, Apapa Plant ( IBAFON)

● Setting out, establishment of Fore-cut & Supervision of Construction of ZENON DIESEL FILLING STATION.( with Raft Foundation Office)

Lagos

● Preparation of Weekly Progress report at the weekly Consultant meeting.

Taking of Levels, Spot heights and obtaining reduced level from a predefined benchmark.