ROBSON HASSAN
Personal data and contacts will be open only to employers with access to CV database
Contractual engineer 450 000
Job Type: Full-Time

Education

From 0 to 2004
BAYERO UNIVERSITY KANO
From 0 to 2013
AHMADU BELLO UNIVERSITY ZARIA
No added languages

Experience

MECHANICAL/ PLANNING ENGINEER
MORPOL ENGINEERING SERVICES LIMITED
September 2011 - Present Day (5 years 10 months)
  • Installation and maintenance of gas station equipments.
  • Ensure that correct engineering standards and procedures are applied on site.
  • Review of ITBs from clients as a member, bids compilation team.
  • Supervise and co-ordinate site activities for construction work.
  • Providing construction engineering support in reviewing of project designs.
  • Monitor project activities and advise the Planning Team and the Engineering Manager on critical areas needing attention.
  • Report to the Engineering Manager and provide progress reports on site work.

PROJECTS:

1. Construction of 24” x 31km gas pipeline for gas supply to PHCN

power plant at Papalanto, Ogun State.

Client: NGC a subsidiary of NNPC.

Date: Oct, 2011-July,2012.

Position: Construction Engineer

Responsibilities:

Overseeing the activities of Civil and Mechanical Engineers on site.

Modification of the piping system at the PRMS station.

Manage Manpower (Welders, Pipe Fitters, Grinders, Operators, Electricians, Mechanics and Helpers at large), Equipments and Consumables to achieve production targets.

Installation and maintenance of fire hydrant pump.

Ensuring conformity to design specifications avoiding environmental hazards bearing in mind the safety of life and properties.

Providing construction engineering support in reviewing of project designs.

Interpretation of P&ID for piping work at the Pig trap stations.

2. EPCC project for 6’’ x 12 km Gas Supply Pipeline to Omowood Industries Ltd Ogbere, Ogun State.

Client: NGC a subsidiary of NNPC

Date: Oct 2012 – Date

Position: Construction Engineer/Site Manager

Responsibilities:

Planning and Execution of the world class gas pipeline project.

MECHANICAL/SITE ENGINEER
AMANI INTERGRATED ENGINEERING LIMITED
January 2011 - August 2011 (8 months)
  • Coordination of water works project.
  • Maintenance of rotating equipments.
  • Management of staff, equipments and materials to achieve managerial goals.
MAINTENANCE SUPERVISOR
MADRATEX LIMITED
September 2003 - September 2009 (6 years 1 month)
  • Maintenance of rotating equipments (Compressors, Motors, Generators etc) and industrial machines
  • Management of maintenance staff, equipments and materials to achieve production targets.
  • Maintenance planning and scheduling
  • General Coordination of the Engineering Department of the Company
INDUSTRIAL TRAINING
FANMILK PLC
March 2003 - September 2009 (6 years 7 months)

Maintenance of cooling systems (Chillers, Cold rooms) and Generators.

Maintenance of packaging machines.

workshop practice using Lathe machine for machining.