Franklin O.
Personal data and contacts will be open only to employers with access to CV database
Controls field offshore supervisor 420 000
Job Type: Full-Time

Education

From 0 to 2000
Institute of Management & Technology (IMT) Enugu.
From 0 to 1997
Institute of Management & Technology (IMT) Enugu
No added languages

Experience

Project Planner/Scheduler
Thomex Energy Limited, Lagos.
May 2010 - Present Day (7 years 1 month)

Recruited to plan, schedule and implement all project activities, develop and implement all building/civil engineering construction procedures/practices to reduce waste of operative time, materials, capital and resources. To ensure equipments for projects are sourced for at a considerable proved reduced price. And tasked to have jobs or projects executed as programmed.

Selected Accomplishments

  • Supervised all construction sites for effectiveness in relation to specification adhesion.
  • Controlled and scheduled all the company project activities with the aid of Microsoft Project ( project management software ).
  • Controlled and managed all operatives, materials and equipments utilization on project site.
  • Conducted the oversea sourcing of subcontractors relevant to a particular project.
  • Oversaw and ensured the materials specified in the job order are sourced for according to the specification indicated.
  • Oversaw all aspect of personnel, materials and equipments management that checked time and resources wastage.
  • Coordinated and inspected construction drawings presented by our claint.
  • Controlled and managed all operatives, materials and equipments utilization on project site.
  • Assisted in ensuring the contract term and responsibilities are analyzed and well explained to project team, which voided the company contract of any irregularities and breach of contract.
  • Constructed and developed project`s master progress plans for various projects
Piping Inspector
Delattre Bezons Nigeria Limited, Bonny Island.
June 2007 - April 2009 (1 year 11 months)

 Spooling of isometric drawings.

 Modify drawings using AutoCAD

 Ensure that all drawings used for fabrication and erection is of latest revision.

 Ensure as built drawing are use for all test packs.

 Punching and ensuring of completeness of all piping systems pre RFSU.

 Ensure complete bolt tightening/torqueing of piping and equipment prior to tightness test.

 Assist in the organization and implementation of all HSE and QA/QC matters at site.

QC Inspector
Nigeria LNG/NPP, Bonny Island
June 2005 - July 2007 (2 years 2 months)

 Coordinate and supervise all the quality control activities in project site with regards to construction, modification and subcontractors activities.

 Advise the managers at site about all the quality matters and contract requirements by providing quality assurance/ services to the required standards.

 Ensuring that contractor follows approved Inspection & Quality Test Plan of the Project.

 Assist in the resolution of quality related problems.

 Participate in discipline CQ walk about.

 Review of contractor’s method statements/procedures before approval

 Witness and monitor of welder Qualification test (WQT) of Subcontractor

 Witness and monitor of Procedure Qualification Test (PQT) of Subcontractor

 Check and monitor of welding consumables and welding parameters as per approved Welding Procedure Specification (WPS) of Subcontractor.

 Ensure that only qualified welders are deploy to weld for WPS qualified.

 Ensuring that Field and Shop Fabrication is in accordance with approved WPS

 Walking of lines to confirm the “As Built” isometric drawings and making punch list where necessary.

 Review of Test Packs.

Piping Inspector.
Chicago Bridge & Iron Nigeria Limited, Bonny Island.
June 2004 - June 2005 (1 year 1 month)

 Spooling of isometric drawings.

 Modify drawings using AutoCAD

 Ensure that all drawings used for fabrication and erection is of latest revision.

 Ensure as built drawing are use for all test packs.

 Punching and ensuring of completeness of all piping systems pre RFSU.

 Ensure complete bolt tightening/torqueing of piping and equipment prior to tightness test.

 Assist in the organization and implementation of all HSE and QA/QC matters at site.