Back to CV list
Kaseem
Personal data and contacts will be open only to employers with access to CV database
Design engineer (as built)
Job Type: Full-Time

Education

From 0 to 2010
Federal University of Technology Akure
From 0 to 2004
Federal Polytechnic Offa
No added languages

Experience

Design Engineer
Ariosh Limited
February 2012 - Present Day (5 years 1 month)

Performing the following duties at Nigeria LNG Asset Information Management (AIM) Project Bonny Island;

  • Performed field verification of PEFS, PFS, Equipment Layout, and Plot Plan in the NLNG Complex Plant (Train 1-6).
  • Analysed Causes and Effect Matrix.
  • Documented inconsistency with standardised mark-up colour coding.
  • Back-drafted field verification mark-up (PEFS) for electronic register using AUTOCAD.
  • Reported safety concerns noted in plant (Train 1-6).
  • Communicated with admin personnel and team leads for document registry.
  • Reviewed redlined mark-up for clarification of finding.
  • Assisted the team leader on man-hour scheduling.
  • Studied process flow philosophy for the plant process (Train 1-6).
  • Ensured electronic transferred copies are exactly transfer before loading on PACER.
  • Appointed the acting team lead.
Trainee Piping Engineer
Amazon Energy Limited
March 2011 - February 2012 (11 months)

Responsibilities: Participated on various different on-going projects

  • On-the-job training and assisted on PGA drawing
  • On the job training and assisted on Data sheet
  • On the job training on how to use P&ID, PFD , Cause and Effect Matrix,

and Legend sheet.

  • On-the-job training and assisted on Isometric generation
  • On-the-job training and assisted on MTO call-out
  • On-the-job training and assisted on section drawing
  • On-the-job training on code and standard referencing
  • On-the-job training and assisted on piping calculation; wall thickness
  • On-the-job training on the use of AutoCAD and PDMS
Trainee Piping Drafter
Arom Limited
March 2009 - September 2009 (7 months)

Responsibilities:

  • Assisted on generating Isometric.
  • Assisted on piping routing using AutoCAD.
  • Assisted on drawing section.