Electrical Engineer 300 000
Job Type: Full-Time

Education

I have no education
No added languages

Experience

Electrical Supervisor
Alcon Nig Ltd
August 2011 - Present Day (5 years 8 months)
  • Reading and analysing of electrical drawings for executions by supervisors and foreman
  • Continuous verification of all cables going to the motor control centre (MCC) and switch room with the aid of our electrical route drawing and cable schedule
  • Verification of core markers and cable sizes
  • Supervision for excavation of cable pulling on trenches and laying of cables on cable trays and cable ladders with the aid of electrical route drawings and electrical cable schedule
  • Supervision for installation, glanding and termination of Aircraft warning light (AWL)
  • Supervision for foundation and erection of lighting poles, installation of junction boxes (JB), glanding and termination for lighting poles
  • Supervision for installation of sacrificial anodes (SA), distribution box (DB), test posts (TP), transformer rectifiers (TR) and deep well for cathodic protection (CP)
  • Continuity test for cables
  • Insulation resistance (IR) test for extra low voltage (ELV), low voltage (LV), and high voltage (HV) cables
  • High potential test on transformers
  • Interface management of electromechanical equipments for electrical and instrumentation work
  • Programming/ scheduling of electrical work with other electrical supervisors and the planning management
  • Weekly update of work done by the electrical crew
  • Emailing of assessment and data base to our head office
  • Emailing of materials requirements for electrical works to the head office
Electrical Officer
Alcon Nig Ltd
August 2010 - July 2011 (1 year 1 month)
  • Dropping of electrical duct banks with the aid of electrical/civil detailed layout drawings
  • Supervision for Looping of electrical poles with the aid of single line diagram
  • Continuity test on cables
  • Insulation resistance (IR) test for extra low voltage(ELV), low voltage (LV) and high voltage (HV) cables
  • Interface management of electromechanical equipments for electrical department
  • Scheduling of the stages of electrical work
  • Supervision for excavation and cable pulling on trenches and duct banks
  • Weekly update of work done by electrical crew
  • Emailing of assessment and data base to our head office
  • Emailing of materials requirement for electrical work to the head office