Stephen
Personal data and contacts will be open only to employers with access to CV database
Electrical Engineer 150 000
Job Type: Full-Time , open to relocation

Education

From 0 to 2008
Federal University of Technology Owerri
No added languages

Experience

Electrical Engineer
Obax worldwide limited
August 2011 - Present Day (5 years 10 months)
I carried out Installation of Electrical facilities and equipments (Three-phase & Single-Phase) such as, Distribution Boxes, Circuit Breakers, Relays, HVAC Systems, Electrical Fittings, Surge Protectors, Inverters, Change-over switches for two or more Power Sources etc. I ensured the use of appropriate Wiring Specifications strictly as recommended in plan for 15Amps and 13Amps Electrical Power Rated equipments I worked with strict adherence to Safety principles and policies I carried out Power System Regulations, Management and Applications I monitored the performance of Diesel power generator ensuring stable and efficient power output I handled Project Execution, testing and Commissioning I carried out Disaster preventive measures such as Earthing, Installation of thunder arrestors, Proper Insulation of electrical power cables, termination points and transmission lines with the use of cable protector kits I maintained and serviced High-Voltage transmission and distribution systems I applied Safety Signs to label Hazardous Areas and Prevent Potential Risks I participated in Contractors HSE RIG PASS Orientation (Land and Offshore Endorsement), working at heights with full Personal Protective Equipments (Harness-Belt, Hard Hat and Cover-all).
  • I use electrical drawing to setup company office electrical wiring installation
  • I installed generator and uniformly distribute load on the 3 phases
  • I use recommended electrical cables and accessories for conduit wiring
  • I installed and maintain the company power generation and transmission system
  • I installed and maintain power back-up system and Inverters to ensure un-interrupted power supply
  • I carry out Installation and maintenance of Electrical facilities
  • I monitor system performance, giving recommendations as applicable
  • I participate in company HSE activities and Tool box meetings
  • I ensure strict compliance to internationally acceptable safety standards in course of carrying out electrical installations
  • I prepare weekly work performance report, and technical equipments requisitions
Field Engineer
Niger Delta Petroleum Resources
June 2007 - May 2010 (3 years 1 month)
  • I worked at the company onshore rig facility maintaining the Electrical Equipments and machines
  • I carried out installation and maintenance of Electric pumps on mud pits
  • I carried out the installation and maintenance of Electric Equipments on the rig such as components of a Solids Control System which includes Vibrators in Shale Shakers.
  • I carried out the installation of Electric motor in the Mud-Mixing Hopper
  • I carried out the installation of Electric motor in the Prime Mover of the Rotary Table
  • I carried out routine checks on power generation and distribution network on the site, ensuring stable and efficient power supply for all equipments and facilities
  • I ensured that power ratings are strictly adhered to during installation of facilities
  • I interpreted P & ID Drawings, control loops, data sheet and Instrument List for Process Control System
  • I used AutoCAD and other computer applications for Engineering purposes
  • I Apply design standards and procedures for control Instrumentation and metering equipments installations
  • I Carried out preventive maintenance of plant parts regularly
  • I Maintained work areas in a clean and organised manner, supervising and ensuring good Housekeeping
  • I Monitored and Reported equipment damage to Project supervisor and carried out maintenance as directed