Back to CV list
Sijithmon
Personal data and contacts will be open only to employers with access to CV database
Electrical expat 300 000
Job Type: Full-Time , open to relocation

Education

From 0 to 1998
S.S.L.C
From 0 to 1999
ELECTRICIAN COURSE CERTIFICATE(Conducted by Indian Engineering Technological Society, Recognized by the Govt. of Kerala, India)
From 0 to 2002
I.T.I ELECTRICIAN CERTIFICATE (issued by the National Council for Vocational Training.)
From 0 to 2012
Diploma in Electrical Engineering ( from EIILM University)
From 0 to 2003
ELECTRICAL WIREMAN LICENCE. (Wireman Permit No. 200996, Issued by A.P. Electrical Licensing Board, State Government of Andhra Pradesh, India.)
No added languages

Experience

Maintenance Supervisor
Sapa Profile India Pvt Ltd, Kuppam, A.P, India
March 2013 - Present Day (4 years 1 month)

Sapa is the world’s largest Extrusion Company devoted to Aluminium solution for many industries and Global supplier of Aluminium Profiles

Asst.Officer
Global Steel Holdings Ltd
April 2006 - December 2012 (6 years 9 months)

All the major maintenance and trouble shooting of the Electrical Equipments and it’s Controls in all the units’ like- DRI plant, Pellet pant, SMS, Rolling mill, Oxygen plant, Lime plant, Utility and Energy Distribution.

· As per Management directive, I have worked for different service departments like Procurement, Administration, Marketing, Water utility dept and Logistic department for short periods.

· Have good Communication skills to Liaise with Nigerian People of all Regions, familiar with most of the places with enough Contacts; also have been travelled to Ghana for Official assignments. Holding a Nigerian Driving License.

· Automation project in Electrical Arc Furnace.

§ Active team member in the project of conversion of all the control systems and contactor logic into totally integrated Automation systems.(SIEMENS S7-300, S7-400 P L Cs) in EAF

§ Carried out the I/O Listing, I/O Modules assignments, Installations and commissioning of Remote I/O stations, PLC and its Auxiliaries.

· Team member in Modification, Operations & Maintenance of Pellet plant & Lime plant. (Previously on contract through TYCO HOFINCONS (20th May 2005 to 20 th Nov 2005) Joined as part of a dedicated team for the revival of the Pellet Plant which was defunct for 10 years.

Operation, Maintenance and troubleshooting of the following Equipments in the pellet plant:

§ AC drives (Omron/Yasakawa VFDs) up to 55Kw. Including modification by replacing of DC motor and its Control unit with all protections to AC motor and System

§ Training the Local Technicians on Electrical equipments and Its controls

§ Actively Participated in TPM Activities like 5S, JishuHozen, OfficeTPM, kobetsu kaizen, Planned maintenance, and Implementation of Standard Maintenance Practices (SMP)

§ BBC make PLC (Procontic), Transformers up to 15MVA, H.T motors with slip ring and Liquid Resistance starter up to 2200 Kw, 6.6Kv, 6.6Kv Switch gear and its MOCBs, 95kw/380v reciprocating Air compressor, L.T motors up to 250kw, L.T MCC (380v), L.T ACB’s and 1020KVA Diesel Generator and its Automatic Change Over system

Electrical Supervisor
Sree Rayalseema Green Energy Ltd, (5.5 Mw Bio-Mass based Thermal power plant. A.P, India.)
March 2000 - April 2006 (6 years 2 months)

Duration: 20th March 2000 to 09 May 2005 as Lead Electrician

: 1st February 2006 to 25 th April 2006 as Electrical Supervisor

§ Erection, Testing, Commissioning, Operation and Maintenance of the following Equipments in the power plant. And actively participated in the supervision of the Erection and Commissioning of 100TPD Sponge Iron plant.

§ IMP make 6.25MVA Transformer with OLTC and Crompton Greaves make VCB with remote operation and other equipments in 33/11Kv outdoor switchyard.

§ 5.5 Mw Turbo Generator, Its auxiliaries like Synchronizing & Relay panel, N.G.R. and L.S.A.P.T, IMP make 1.25 Mva Transformer 11Kv/433V with PCC and ACB’s, 11Kv VCB indoor switch gear with remote operation, make; Siemens,

§ V.V.F.D Drives up to 75Kw motors, Laying of LT cables and terminations. L.T. Motors up to 90 Kw which includes Slip ring motors, Squirrel cage & D.C Motor.

§ All Electrical equipment’s of the Boiler, D.M Plant. PCC, MCC, LDB, 500 KVA Diesel Generator (make Kirloskar) for Emergency/Backup, 15kw Air compressor.

§ Electrostatic Precipitator and its auxiliary equipments i.e. rapping motors, Heaters, Rapping Programmers and Electronic Controller.

§ Having hands on experience in Synchronizing power to the Grid, and also General Knowledge On 22.5T/hr travelling grate boiler control room operation and 6.0 MW Steam Turbine and associated Auxiliary’s operation

Assistant Electrician
M/s. Madhu Solvents Pvt. Ltd. Andhra Pradesh, India,
August 1999 - March 2000 (8 months)

Company profile: Consisting of 2 Solvent plants, Refinery, Boiler and Cotton Seed Oil plant.

Duration: 8th Nov. 1999 to 19th March 2000 as Assistant Electrician

§ Worked as Assistant to the Sr. Electricians in Operation &Maintenance of all electrical equipments in the above units.

Additional information

About Me

14 yearsof experience in the field of Electrical Operations & Maintenance in Power, Steel and Aluminum Extrusion sectors

Have good Communication skills to Liaise with Nigerian People of all Regions, familiar with most of the places with enough Contacts; also have been travelled to Ghana for Official assignments. Holding a Nigerian Driving License

Having hands on experience in Synchronizing power to the Grid.