James
Personal data and contacts will be open only to employers with access to CV database
Electrical supervisor
Job Type: Full-Time , open to relocation

Education

From 1998 to 2000
Akanu Ibiam Federal Polytechnic Unwana, Afikpo
Electrical / Electronics Engineering
HND
From 1995 to 1997
Federal Polytechnic Nekede Owerri
Electrical / Electronics Engineering
OND
Languages:
English Fluently

Experience

ELECTRICAL INSTALLATION AND MAINTENANCE ENGINEER
Prodeco Ltd, Intels Group, Port Harcourt
September 2013 - August 2016 (3 years )
Rivers
Port Harcourt
1. Organizes work schedule and supervises the Company’s Electro-Mechanical Projects as well as the work of Electrical/Mechanical Personnel 2. Supervision of Electro-Mechanical works. Keeps record of corrective action report and non-conformance report raised as a result of deviation from contract specification and subsequently forward same to MEP manager. Monitor to ensure that all necessary corrections are made 3. Plan, co-ordinate and control the development of Instrument/Electrical Engineering for Project activities performed inside or outside the Company in accordance with project/client requirements. Assure compliance with all Project interfaces and supervise in-out information flow. 4. Electrical Wiring Installations (Domestic and industrial) of Office buildings, Workshops, Warehouses, residential buildings and Guest House Accommodation at company's premises and outstation sites. 5. Construction/building, Installations & fault tracing in LV & MV substations, Electrical Panels ,feeder pillars , Switch gears& Bus bar Chambers . 6. Laying Underground pipes and Armored Cables from substations to Medium voltage (ML) and Low Voltage panels (LV) 7. Illumination check of lighting system in all installations. 8. Line checking and Meggering of low voltage power and control cab
ELECTRICAL INSTALLATION AND MAINTENANCE ENGINEER
WEST AFRICAN ENGINEERING PLANT
October 2012 - August 2013 (11 months)
Rivers
Port Harcourt
1. Monitor Integrity Test on Electric Motors, E&I Cables, Earth Pits, Earthing System, Transformer, Fire, Gas and Smoke Detection System and Integration with the Process Instrumented Protective System. 2. Monitor the proper implementation of the project procedures and specifications. 3. Material Inspection and testing to conform to standard 4. Monitor the continuity & insulation resistance test, installation of instruments, fiber optic cable. Verify special processes and the relevant workers’ qualifications, Witness the tests, controls and inspections carried out. 5. Conduct Toolbox/Safety Meetings 6. Responsible for the observance of safe work practices within the field and workshop areas and ensures that applicable safety procedures and regulations are observed by the personnel or the Crew. 7. Ensure that all installation and repair work is carried out to the applicable codes of practice and standards according to Project approved drawing. 8. Installations, connections and testing of different types of power generators ranging from 1KVA-1500KVA 9. Able to read plans and Blue prints of Power generation, Transmission and distribution systems. 10. Supervise cable pulling, glanding and termination of Low and Medium Voltage cables from substation to switch gear panels as per manuals and specifications. 11. Installation, connection and testing of different
ELECTRICAL SUPERVISOR
PRODECO LTD, ABA ROAD CAMP, PORT HARCOURT
July 2002 - September 2012 (10 years 3 months)
Rivers
PORT HARCOURT
1. In charge of the Electrical team assigned to the Refurbishment of shell R. A. Restaurant (2003). Prodeco - Shell project no. E14388. 2. In charge of Electrical Team Assigned to the prodeco Contract in Shell I. A. (2004) 3. Installations and Connection of Submersible pumps, Surface pumps and different types of water Pressure Pumps and systems 4. Installations and connections of high tension and instrument transformers 5. Installations, Repairs and Maintenance of the company’s concrete Batching Plants. 6. Installations and Repairs of Different types of electrical Machines (Lathe machines, Block Molding machines, Wood sawing machines, Electric concrete mixers, Iron cutting machines, different types of Electrical Welding machines etc.) 7. Repairing of Electrical power Tools(Hilti, Bosch & Spit power tools) and other Electrical Gadgets in the company 8. Ordering of spare parts for the preventive maintenance program of Electrical machines. 9. Supervising the plumbing and A/C installations and Maintenance in the company’s camp and general yard. 10. Installations and Tracing of Faults along the Perimeter and Street Lights in the company premises 11. In charge of the Electrical team assigned to the erection, connection & installation of NLNG Street lighting poles at the NLNG access road PH. 12. Erections, Installations, Repairs and maintenance of High Mast Tower light of 25Mts, 12Floodlights and 2000W each. 13. Erections, Installations, Repairs & Maintenance of Maber Transport platform (Maber Elevators) in the company’s construction sites 14. In charge of Electrical team assigned to the Electrical Installations of 7storey building in Heliconia Park Estate, Port Harcourt. 15. Installations of Earthen systems in high rise buildings and construction sites 16. In charge of Electro-Mechanical team assigned to the Electrical/mechanical installations and maintenances of Heliconia Park Estate, Amadi Creek.

Additional information

Referees
Chief Vitalis Azodo HR Manager Prodeco Ltd Port Harcourt 08033385994; HRH EZE R.O. OKORO Traditional Ruler Ugbelle Autonomous Community Ideato South L.G.A Imo State. 08037933922
Certificates, Courses, Trainings
a) SUPERVISORY COURSE March, 2007 b) FIRST AID SAFETY TRAINING DEC. 2008 c) PERMIT TO WORK TRAINING JAN. 2009 d) BASIC FIRE FIGHTING TRAINIING JAN. 2009 e) CONFINED SPACE ENTRY TRAINING FEB. 2009. f) INCIDENT/ACCIDENT INVESTIGATION &REPORTING FEB. 2009 g) BASIC FIRST AID TRAINING DEC.. 2008. h) FIRE PROTECTION/PREVENTION NOV. 2008. i) SAFE USE OF TOOLS & EQUIPMENT AUG. 2008 j) PROJECT DOCUMENTATION & REPORTING WORKSHOP. OCT. 2007 k) LIFTING & RIGGING TRAINING BY CROSBY August, 2009 l) ELECTRICAL SKILLS COURSE October, 2010 m) PLANT MAINTENANCE / TROUBLESHOOTING November, 2011 n) IMPROVING MATERIALS MANAGEMENT COURSE March, 2012 o) BASIC PROJECT MANAGEMENT April, 2012 p) LOCKOUT AND TAGOUT TRAINING. OCT 2007 q) ENVIRONMENTAL WASTE MANAGEMENT COURSE September, 2012 r) MANAGING FOR SUCCESS August, 2014
About Me
a) Very good team leader b) Proficient in MS office suites c) Solid Project Management and communication skills d) Quality result oriented. e) Huge Experience working with heavy industry Machinery and equipment f) In-depth knowledge of medium voltage distribution and low voltage network. g) Ability to work without supervision. h) Familiarity with electrical codes and standards i) Strong organizational and planning skills. j) Excellent trouble shooting skills k) Skilled in using electrical schematics and testing instruments l) Outstanding ability to read line and schematic diagrams m) Highly adaptable to different work situations n) Capable of working very long hours.