Back to CV list
Michael
Personal data and contacts will be open only to employers with access to CV database
Engineer, access supoort 500 000
Job Type: Full-Time

Education

From 0 to 2007
Federal University of Technology, Minna.
From 0 to 1996
Okoro Gbede High School, Kogi State
No added languages

Experience

TELECOM & POWER SUPERVISOR: BSS/Transmission Engineer ( Etisalat Project 2G and 3G) in Osun, Ond
TUNSEN NIGERIA LIMITED, 5, Balarabe Musa off Samuel Manuwa Street, Victoria Island, Lagos Nigeria.
November 2009 - Present Day (7 years 6 months)

xecute Troubleshooting and maintenance of Evolium NEs (Running on B10 & B11 SW Version) via LMT & OMC-R (A1353 & A9153).

  • Execute Hardware & Software configuration of Evolium BTS A9100.
  • Commissioning & maintenance of Microwave Transmission Link [AWY 9400, MXC 9500 (HARRIS-STRATEX ECLIPSE), MPR 9500, MPT-MPR 9500].
  • E1 Capacity increase of LX/UX and AWY PDH Access Radios.
  • Lagos-Benin republic E1 capacity increase via Huawei OSN & Media Gateway.
  • Daily preventive maintenance of the network elements.
  • Site Integration including Cross-connection to the BSC.
  • Monitor the operations and performance of all power equipment to ensure proactive identification and resolution of faults
  • Carrying out services and repairs on installed power & cooling systems and other associated accessories.
  • Migration of Sites from one BSC to another.
  • Executing B9/B10 alarm simulation on A9130 BSC.
  • Supervision and rendering of high level of technical support on the network.
  • Site acceptance with clients (ETISALAT).
  • Planning and execution of cutovers on Microwave links.
  • Perform Routine O & M procedures for Transmission Networks.
  • Maintenance of comprehensive records on Transmission links, RBS sites equipments and spares for all sites within my assigned area.
  • Ensure maintenance works undertaken by sub-contractors meets the required specification.
  • Implementation and supervision of network Transmission & RBS expansion/upgrade.
  • React to emergency faults and ensure that all faults are rectified within the stipulated SLA.
TEAM LEAD, BASE STATION INSTALLATION AND TRANSMISSION ENGINEER.
Mutek Communications Ltd, suite A201 Millennium Verdict plaza, 35 Ademola Adetokumbo Crescent, Wuse2, Abuja.
March 2009 - November 2010 (1 year 8 months)
  • Installation of Huawei BTS 3900, 3012, 3012AE for MTN in Abuja and Northern Region.
  • Installation of Batteries as Back up to the electricity supply to BTS sites.
  • Installation of Environmental monitoring unit (EMU).
  • Involved in Huawei BTS 312 to BTS 3012 Swap out for MTN in Abuja.
  • GSM Boards, Environmental, Power and VSWR Alarm clearing and maintenance.
  • E1 Termination of sites and BTS configuration upgrade for MTN sites.
  • Integration and jumping of sites and BTS Configuration upgrade for MTN sites.
  • Power Termination on DB and RBS.
  • Installation and maintenance of radio frequency antenna e.g. Katherine, Andrew.
  • Installation and maintenance of sectorial (BTS) antenna (900GSM & 1800DCS).
  • Termination of RF feeders.
  • Installation of Diplexers.
  • Troubleshooting of RF installations.
  • Installation and servicing of Air Conditionals.
  • Carrying out of VSWR and DTF Test using VSWR Tester.
  • Proficient use of

1. VSWR Tester.

2. Compass

3. Inclinometer

I.T Administrator (NYSC Primary Assignment)
) National Board for Technology Incubation (NBTI), Federal Ministry of Science and Technology Sokoto, Sokoto State.
May 2008 - February 2009 (10 months)
  • Installation and maintenance of computer Hardware and software.
  • Configuration, administering windows operating system.
6 Month industrial Attachment
Fastspread Communications Ltd, Lagos
April 2006 - October 2007 (1 year 7 months)
  • Maintenance and Servicing of 13.5KVA & 20KVA Perkins & FG Wilson Generators.
  • Installation and servicing of Air Conditionals.