Position: Quality Control/Quality Assurance Inspector/ Civil Engineer
Makon Engineering and Technical Services
January 2012 - Present Day (5 years 5 months)

· Supervision of Field Density Test and Soil Compaction Test .

Writing of method statement

· Slump test and Cube Crushing Test

Tracking of Vibrator Pile for the AG Compressor foundations.

Bentonite slurry test

· Permit Holder

Follow up on Construction activities

· Oil and Gas Project (IOGP), using the piping general layout drawings and P&ID.

· Preparation of as-built drawings and documents

· Ensuring that all project quality requirements is implemented.

· Follow up on project inspections

· Generating of daily/weekly reports from field supervision and inspection

· Generating Red-line/ As-built logs

· Representing the QA/QC dept. On some technical issues.

· Checking and controlling of correct size and choice of material for civil works

· Taking records of material data and specifications, and sizes to conform with project requirements and specification

· Supervising of lifting activities to make sure there is no loss of materials and life

Notification of QA/QC & SPDC for material receiving inspection

· Notification for inspection & test,

· Notification for hold & witness point as per project ITP

· Checking of correct sizes of aggregates as per SPDC specification.

· Control of work flow, manpower checks and control, monitoring of work progress

Ø Checking and controlling of correct size and choice of material for civil works

Ø Taking records of material data and specifications, and sizes to conform with project requirements and specification

Ø Supervising of lifting activities to make sure there is no loss of materials and life

Ø Notification of QA/QC & Septa for material receiving inspection

Ø Notification for inspection & test,

Ø Notification for hold & witness point as per project ITP

Ø Checking of correct sizes of aggregates as per SPDC specification

MANPOWER MANAGEMENT & CONTROL

Ø Control of work flow, manpower checks and control, monitoring of work progress

Quality Control/Quality Assurance Inspector/ Civil Engineer
Makon Engineering and Technical Services Plot 364 JC Street, Trans Amadi Industrial Layouts, Port-Harcourt., Rivers State. Project: DOMGAS PROJECT (AGBADA) Client: SPDC
January 2012 - Present Day (5 years 5 months)

· Supervision of Field Density Test and Soil Compaction Test .

Writing of method statement

· Slump test and Cube Crushing Test

Tracking of Vibrator Pile for the AG Compressor foundations.

Bentonite slurry test

· Permit Holder

Follow up on Construction activities

· Oil and Gas Project (IOGP), using the piping general layout drawings and P&ID.

· Preparation of as-built drawings and documents

· Ensuring that all project quality requirements is implemented.

· Follow up on project inspections

· Generating of daily/weekly reports from field supervision and inspection

· Generating Red-line/ As-built logs

· Representing the QA/QC dept. On some technical issues.

· Checking and controlling of correct size and choice of material for civil works

· Taking records of material data and specifications, and sizes to conform with project requirements and specification

· Supervising of lifting activities to make sure there is no loss of materials and life

Notification of QA/QC & SPDC for material receiving inspection

· Notification for inspection & test,

· Notification for hold & witness point as per project ITP

· Checking of correct sizes of aggregates as per SPDC specification.

· Control of work flow, manpower checks and control, monitoring of work progress

MATERIAL CHECK & CONTROL

Ø Checking and controlling of correct size and choice of material for civil works

Ø Taking records of material data and specifications, and sizes to conform with project requirements and specification

Ø Supervising of lifting activities to make sure there is no loss of materials and life

Ø Notification of QA/QC & Septa for material receiving inspection

Ø Notification for inspection & test,

Ø Notification for hold & witness point as per project ITP

Ø Checking of correct sizes of aggregates as per SPDC specification

MANPOWER MANAGEMENT & CONTROL

Ø Control of work flow, manpower checks and control, monitoring of work progress

Position: Quality Control/Quality Assurance Inspector Project:Uquo Gas Plant Project Clie
Alcon Nigeria Limited
July 2011 - January 2012 (7 months)

Responsibilities

· Facilitate the fulfillment of Inspection and Test requirements of the contract at all stages of the project

· Liaises with the construction supervisors on all quality related activities of the project

· Verifies the corrective and preventive actions taken on Non-Conformances Records (NCR’s) raised on the project and forwards them for further action and review of QA/QC Manager

· Ensures Maintenance of calibration records for Measuring and Monitoring Devices used in the project

· Conduct and Manages the civil Works Sites Laboratory

· Ensures that pertinent records of Inspection and Test are conducted till the end of contract and transmit all pertinent records to the QA/QC Manager.

· Progress reporting : both in house and to Client

Position: Quality Control/Quality Assurance Inspector
Alcon Nigeria Limited # 117 Trans Amadi Industrial Layouts, Port-Harcourt., Rivers State. Position: Quality Control/Quality Assurance Inspector Project:Uquo Gas Plant Project Client: Septa Energy
June 2011 - January 2012 (8 months)

Responsibilities

· Facilitate the fulfillment of Inspection and Test requirements of the contract at all stages of the project

· Liaises with the construction supervisors on all quality related activities of the project

· Verifies the corrective and preventive actions taken on Non-Conformances Records (NCR’s) raised on the project and forwards them for further action and review of QA/QC Manager

· Ensures Maintenance of calibration records for Measuring and Monitoring Devices used in the project

· Conduct and Manages the civil Works Sites Laboratory

· Ensures that pertinent records of Inspection and Test are conducted till the end of contract and transmit all pertinent records to the QA/QC Manager.

· Progress reporting : both in house and to Client

Position: Civil Engineer
Rockson Engineering Company Limited # 265 Trans Amadi Industrial Layouts, Port-Harcourt. Rivers State. Position: Civil Engineer Projects: (i) Alaoji Gas Turbine, Egbema Gas Turbine, Gbarain Gas Turbine etc
July 2009 - May 2011 (1 year 11 months)

Responsibilities

· Civil & Structural Engineering Design and Detailing

· Contract Engineering e.g. tendering/bidding

· Preparation of Project Specification

· Preparation of Work Procedures

· Preparation of Bar bending Schedule for all site.

· Progress reporting : both in house and to Client

Position: Civil Engineer Projects: (i) Alaoji Gas Turbine, Egbema Gas Turbine, Gbarain Gas Turb
Rockson Engineering Company Limited
January 2009 - June 2011 (2 years 5 months)

Responsibilities

· Civil & Structural Engineering Design and Detailing

· Contract Engineering e.g. tendering/bidding

· Preparation of Project Specification

· Preparation of Work Procedures

· Preparation of Bar bending Schedule for all site.

· Progress reporting : both in house and to Client

Position: Quality Control/Quality Assurance Inspector
Alcon Nigeria Limited
November 2006 - June 2009 (2 years 7 months)

Responsibilities

· Overall Quality Control Supervision of Construction Works

· Checking to ensure conformance of Engineering design with construction

· Preparation of Project Specification

· Preparation of Work Procedures

· Ensuring adequate inspection of mix design, physical test on concrete sample.

· QA/QC supervision of all construction work in line with the company’s QA/QC policy and implementation of the ITP’s approved by the client

Position: Quality Control/Quality Assurance Inspector
Alcon Nigeria Limited # 117 Trans Amadi Industrial Layouts, Port-Harcourt., Rivers State. Position: Quality Control/Quality Assurance Inspector Project: (i) Okoloma Gas Plant Afam Project Client: SPDC
November 2006 - June 2009 (2 years 7 months)

· Overall Quality Control Supervision of Construction Works

· Checking to ensure conformance of Engineering design with construction

· Preparation of Project Specification

· Preparation of Work Procedures

· Ensuring adequate inspection of mix design, physical test on concrete sample.

· QA/QC supervision of all construction work in line with the company’s QA/QC policy and implementation of the ITP’s approved by the client

Position : Civil Engineer
RODEC Services (Mechanical & Civil Engineering Contractors) #133 NLNG Road, Port Harcourt, Rivers State. Position : Civil Engineer Project : Renovation of 2Nos Lawn tennis Court and Estate office Client : Notore Chemical Industry Onne
September 2005 - October 2006 (1 year 2 months)

Responsibilities

· Contract management from tendering stage

· Project Management, Planning & Costing.

· Preparation of Project Execution Procedures

· Site Supervision.

Position: Project Engineer
NUGI LIMITED (Civil Engineering Company) KM 8 Eneka Igwuruta Express Road, Port Harcourt, Rivers State. Position: Project Engineer Project: Engineering, Procurement & Construction of IA Road AA and 9 Extension Client : Nigeria LNG,Bonny I
May 2004 - June 2005 (1 year 2 months)

Responsibilities

·Contractmanagement from tendering stage

·Engineering design and detailing of Trapezoidal drains and Road Pavement.

·Liaising with Clients on all Project issues.

·Preparation of Project Execution Procedures

·Construction Site Supervision.

·Overall Quality Control Supervision and documentation.

Additional information

About Me

SKILLSDexterity on Computer with:AUTOCAD, RCC- Structural design Software, , Microsoft Project, MS-office (Excel, Word, Power Point & Access)

TRAININGPersonal Safety and social Responsibilities (JODOR International Service LTD)

Elementary First Aid Training Certificate (JODOR International Service LTD)

Fire Prevention & Fire Fighting Training Certificate (JODOR International Service LTD)

The Permit To Work Training Course (HSE level 3)