Back to CV list
UGOH
Personal data and contacts will be open only to employers with access to CV database
Engineering/pipeline maintenance
Job Type: Full-Time

Education

From 0 to 2008
UNIVERSITY OF NIGERIA,NSUKKA
No added languages

Experience

OPERATOR/SUPERVISOR
BJ SERVICES LTD
October 2008 - June 2011 (2 years 9 months)

Training:

Basic Offshore Safety Induction Emergency Training (BOSIET) 2010

. Helicopter Underwater Escape Training (HUET)

. Fire Fighting, .First Aids Application.

Work Experience

SOME PROJECTS CARRIED OUT

SPDC (Oil and Industrial Services) 2012

. Pipeline Pre-commissioning of Flushing, Pigging and Hydrotesting

Of 6’’ x 9KM Oil Pipeline from Tora Manifold Odioma Flowstation

NNPC/Chevron-Dibi South Compressor Station (Halliburton) 2012

Pre-Commissioning Services

. Oil Flushing of Lube Oil Piping Low Pressure and High Pressure Coolers and

Stainless Steel Piping on Dibi and Olero Barges (Aveon Offshore LTD)

NNPC/Chevron-Olero Creek North Compressor Station (Halliburton) 2012

. Pre-Commissioning Services

. Chemical Cleaning for Gas Compressor Pipings 1st & 2nd stages Olero Barge.

. Chemical Cleaning of Lube Oil Piping Low and High Pressure Coolers and

Stainless Steel Piping.

. Chemical Cleaning of Glycot Heat Exchanger. (Aveon Offshore LTD)

Total Upstream (USAN FPSO) USAN Project (Trueblue Energy Services) 2011

. USAN Project - Intelligent Pigging for GI flowline O/B FPSO Pigging Operations

(Launching and Receiving) Intelligent Pig, 8’’ x 11KM Subsea Pipeline.

ExxonMobil (Harlliburton) 2011

OSO-Condensate Pipeline Replacement Project (OSO-RE)

. Leak Test of Test Packs 1,2,3,4 and 5 of OSO-RE Wells and Headers 28E,29E,

30E,42E and 43E

. OSO-RE Topside Restoration Leaktest.

SPDC (OIL AND INDUTRIAL SERVICES) 2011

. Flushing, Pigging, Hydrotesting of 10’’ x 4.5KM Crude Oil Pipeline from

Ekulama 1 Flowstation to Manifold near Ekulama 2

BJ Services Ltd, Plot 54 Trans-Amadi Industrial Layout Port Harcourt, Rivers State, Process and Pipeline Services Department, from October 2008

To June, 2011

Position: Operator

Addax Petroluem Development Company 2011

. Flowline Top-Up and Testing, Umbilical Leak Test

HHI Bonny Island (Pumpking Oilfield Services) 2010

. Pipeline cleaning, gauging and testing

Bonga Pipeline and Process Project 2010

. Flooding, Dewatering, Drying and Testing of 16’’. 12’’ and 10’’ Flowlines

SPDC (Client B+B) 2010

. Dewatering and Drying of 36’’ Line from Soku to new Calabar River

Agbami Project (Chevron Field) 2010

. Pigging, Hydrotesting, Dewatering and Umbilical test of various lines

SPDC 2010

. Desanding of close and open drains systems at Santa Barbara flow station

Daewoo Nig. Ltd, (SPDC Egg Project Phase 2) 2009

. 40’’x 58KM Pipeline Pre-Commissioning (cleaning,gauging,testing,

dewatering and drying) from Gbaran to Soku

ELF Petroleum Nigeria LTD 2009

Pipeline Pre-Commissioning of OB 122 Pipelines

. 8’’ Pipeline Pigging Operations

. 8’’ Pipeline Cleaning and Gauging Operations

. 8’’ Pipeline Hydrotesting Operations

. 1’’ Pipeline Hydrotesting Operations

Petro Chemical 2009

. Installation of Piping in areas 900 and 1100, Eleme Petro-Chemical Plant

Subsea 7 Okwori 2009

. Pre-Commissioning of 3 flow lines and Umbilical on FPSO

Subsea 7 Okwori, Phase 4 Project 2008/2009

. Pipeline and Umbilical Pre-commissioning, Serje Berge

NIGERIAN BREWERIES PLC, NEM DEPT, IGANMU HOUSE, IGANMU, LAGOS

April, 2009 ----- March, 2010 (NYSC)

POSITION: Assistant to Spare Parts Manager on Project/Project

Coordinator

Duties:

1 Project Planning, Organizing, and Supervising of New Brewery Line for the expansion and Production of different brands of Alcoholic and Non- Alcoholic drinks of Nigerian Breweries Plc (Heineken International).

2 Coordinating of Spare Parts of various machines to all Nigerian Breweries locations across Nigeria by the use of the company’s Software program, also to track down the various positions where these Parts are kept by the use of same software program.

Industrial Training:

BJ SERVICES LIMITED - Plot 54 Trans Amadi Industrial Layout Port Harcourt Rivers State, PROCESS AND PIPELINE SERVICE DEPT.

APRIL, 2007 – DECEMBER, 2007

POSITION: INDUSTRIAL TRAINEE.

SOME PROJECTS CARRIED OUT

DUTIES:.

West African Gas Pipeline (WAGP) 2007

Pre-Commissioning Services

. Pipeline Cleaning, Gauging, Hydrotesting, Dewatering, Drying

. Nitrogen Packing from Badagry Lagos to Takoradi (Ghana)

. Pigging of 32’’ 56KM Gas Line from Lagos Beach Compressor

Station to Alagbado.

Addax Petroleum Company Ltd; FPSO Topside Project 2007

. Flushing and Hydrotesting of Topside Production

. Piping on FPSO

. Flushing and Leaktesting of Topside

. Umbilical System and Installation.

Exxon Mobil (Golden Metro) 2007

. Pipeline Pre-Commissioning Operation of Pigging, Hydrotesting

. Dewatering and Drying of Interfield Flowlines

. Nitrogen Packing.

SPDC, Buguma 2007

. Pipeline Cleaning, Gauging and Testing

1 Participated in various seminars on Health, Safety and Environment.

2 Learning and Mastering of Safety rules and regulations necessary to carry out Safe and Accident-free work Environment.

3 Learning and Mastering of how to use various tools and Equipment when carrying out the above mentioned maintenance Operations to avoid accident while at work.

CERTIFICATION: . Nigerian Institute of Management (Chartered) 2009

. Seminar/Workshop Program on job creation and awareness

16th – 20th March, 2009

. IT Training on Microsoft Word, Spreadsheet Using Microsoft

Excel. Power Point. August, 2008 – October, 2008.

PROFESSIONAL MEMBERSHIP

Graduate Member - Nigerian Institute of Management (CHARTERED) 2009

Graduate Member - Nigerian Society of Engineers (NSE) 2009

CAREER OBJECTIVES

To make positive Contribution to the development of the organization

I find myself.