Back to CV list
KEHINDE,ADEKUNLE
Personal data and contacts will be open only to employers with access to CV database
Graduate trainee 75 000
Job Type: Full-Time , open to relocation

Education

From 0 to 2009
UNIVERSITY OF IBADAN
From 0 to 2003
YABA COLLEGE OF TECHNOLOGY
No added languages

Experience

PROJECT SUPERVISOR AND ANALYST
JOWARET NIGERIA LIMITED
May 2011 - Present Day (5 years 11 months)
  • Designing of Network diagrams and Gantt chart for activities
  • On-site supervision, monitoring and coordination of workers and machines
  • Preparing detailed work-plan for clients so as to determine the critical path, slacks, latest start time, earliest finish time, earliest start time and most importantly the latest finish time of the project.
  • Preparing bid and quotation for anticipated projects
INDUSTRIAL ENGINEER II
7UP BOTTLING COMPANY
April 2010 - March 2011 (1 year )

Challenged with increasing product quality, improving process flow, and reducing cost while maintaining or improving safety in this bottling company. Develop, evaluate, document and advance manufacturing methods and processes through lean techniques and Kaizen events. Analyze and reengineer production layouts, designing and implementing efficient and quality projects across production lines. Collaborate with administrative and financial teams to establish viable support of safety standards. Provide ongoing production support and troubleshooting.

Selected Contributions:

  • Collaborated with senior management through the principal engineer on Business Process Reengineering (BPR) efforts, gaining 7% increase in productivity and quality.
  • Establish first preventive maintenance schedule, ensuring optimal equipment operation without costly downtime.
  • Created and implemented efficiency work-study which generates more than 5% improvement through associated cost reductions.
  • Significantly reduced waste and end to end production time by leveraging expertise with Statistical Process Control (SPC) methodology
ENGINEERING TRAINEE(INTERN)
DANA GROUPS
May 2008 - September 2008 (5 months)
  • Regeneration of the infusion plant using concentrated acid and caustic soda
  • Infusion Plant maintenance officer(Mechanical, Electrical and Pneumatic systems trouble shooting)
  • Bore-Hole removal, installation and Panel trouble shooting
  • Steam Plant (Boiler)maintenance officer and operator
  • Plant facility layout re-designing
  • Rebuilding and Installing old and new plants(machines and equipments)
  • Installation and maintenance of utilities (electric modular light and power system, distribution fuse board trouble shooting etc.

Introduction of Peg-board chart as a means of achieving planned and preventive maintenance