Back to CV list
POLYCARP UCHENNA
Personal data and contacts will be open only to employers with access to CV database
Head operations/ project manager 300 000
Job Type: Full-Time

Education

From 0 to 2008
EDUCATION: · HND Building Technology (Distinction) – Federal Polytechnic Auchi   
From 0 to 2013
 - 1999 · PGD Financial Management  National Open University of Nigeria
From 0 to 2011
Project Management Professional (PMP) training with Digital Jewels, affiliate of VIRAK Switzerland   -    2008  
No added languages

Experience

HEAD OPERARIONS/ PROJECT MANAGER
MTS PROPERTIES
June 2007 - January 2011 (3 years 8 months)

MTS PROPERTY DEVELOPMENT Company Ltd. (2007 – date)

Head of Operations/Project Manager

Key Responsibilities:

· Annually managed construction of residential and commercial building projects of value N2.44b

· Supervising team of contractors up to 10 with their different gangs of craftsmanship · Preparing detailed program based on critical part of the projects.

· Liaising with the various consultants and resolving issues on critical areas.

·  Liaising with the various contractors and addressing issues on area requiring detailing. · Attending site meetings and addressing issues with the different project teams as the need arises.

· Estimating project cost based on designed information, performed take-offs and develop project proposals; working directly with the General contractors.

· Preparing rates and comparing detailed bills of quantities prior to construction periods. · General site supervision thus; ensuring strict compliance of practical execution to the specification and job design.

Completed Projects with the Company:

1. Palm Garden Estate of 12Nos units semi detached apartments (one storey building each)

Violet Court Estate.  

3 floors 6 units terrace building;

2 nos  3 floors 5 units terrace building;  

3 floors 6 units block of offices;  

6 floors 12 units block of flats built on piled foundation

SITE MANAGER
PROJECTS QUARANTY LTD
July 2006 - May 2006 (1 month)

PROJECTS GUARANTY Ltd. Building Contractors (2005 – 2006) Site Engineer/ Manager Key Responsibilities

· General Supervision / Site Management of  different projects ·

 Attending site meetings and deliberating on critical issues, progress of work and the way forward

· Compiling detailed reports on work progress, issues and matters requiring urgent attention to the CEO to whom I report directly.

Completed Projects with the Company:

1. 1004 Flats Lagos Island - Demolition & Renovation of building Works

2. Chevron Staff Quarters Construction at Carlton Gate Lagos

Site Engineer
Arbico Plc
February 2001 - March 2005 (4 years 2 months)

ARBICO Plc NIGERIA - Building / Civil Engineering Contractors (2001 – 2005)

Site Engineer

Key Responsibilities

· Taking Levels Using Instrument Level for all inverts and component levels

· Setting out Structural/Architectural Details

· Ensuring that formworks are rightly made to enhance finished concrete shape and quality.

· Ensuring that rebar are fit as designed. ·

 pre-empting actual quantities required for  sections of work for  earlier material delivery    · Estimating tonnage of reinforcement required.

· Supervision of Electrical/Mechanical works

· Supervising all sections of work to ensure they meet targeted results

· Quality assurance (concrete and reinforcement) Completed Projects with the Company: 1. Union Bank Plc – A 5 storey building with pile foundation in Victoria Island Lagos 2. Effluent treatment plant and separation drains – a Coca-Cola Project Ikeja Lagos 3. Warehouse base construction Coca-Cola 1. Road extension/ bridge Coca-Cola 4. Mechanical workshops Coca-Cola  pant B  

NYSC
FEDERAL MINISTRY OF WORKS AND HOUSING FCT
January 1999 - February 2000 (1 year 2 months)

FEDERAL MINISTRY Works & Housing HQ FCT Abuja (1999 – 2000)

National Youth Service Corps NYSC

Key Responsibilities:

· General Supervision of Building & Civil Engineering Projects

· Participating in Architectural Designing & Drafting of Buildings

· Measurement of Building Works Project attached to: 1. Public housing units FCT Abuja  

one industrial trainee
JULIUS BRGER Nigeria pLC (Abuja site
May 1994 - May 1995 (1 year 1 month)

JULIUS BERGER Nigeria Plc (Abuja Site 1995)

One year Industrial Trainee

Key Responsibilities:

· Soil Investigation for Engineering Construction

· Determination of Soil Engineering Properties

· Civil/ Road work constructions