Lead Inspection Engineer
Engineering Automation Technology Limited
July 2009 - Present Day (7 years 9 months)

 

·                              Responsible for all safety needs of the job and of the personnel while on site, including the preparation of PTW and  JHA.

 

·                              Carry out inspection of  materials and equipment for the fabrication of Ubit E, Enang JE and Unam A accelerated temporary Gas lift Pipeline project for EXXON MOBIL .

 

·                              Conduct thorough examination of lifting equipment and accessories for purpose of certification

 

·                              On-Board FPSO MYSTRAS- carry out load test/ inspection of  Pneumatic winch for OKONO 6 & 7 Development.

 

·                              Conduct thorough examination/magnetic particle test for SAIPEM/ TOTAL’s USAN,USARI  and OML 58 Projects.

 

·                              Third Party Certification of  lifting equipment for Chevron’s Olero creek project, SHELL’s BONGA North West Project, TOTAL’s OFON,NOPL and OUR pipeline Projects.

 

·                              Supervise  maintenance services on company facilities such as compressors, generators, and lifting equipments and issue report using the company’s computer-aided  management package.

 

·                              Carry out Material Identification as per Material Specification and Grade and Reviewing the Original Mill T.C for material Traceability.

 

·                               Conduct inspection/Hydro test on 24” Pipe for Exxon Mobil’s IDOHO SUBSEA RISER SPOOL Project.

 

·                              Performed detailed calculations to establish inspection standards and specifications, maintaining 100% accuracy  rate.

 

·               Conduct Ultrasonic thickness guage/Inspection of pressure Vessel and  process tanks for Exxon mobil Nigeria.

 

·                              Interface with clients to develop ITP Plan  requirements  for the Enang JE Gas lift project.

 

·                              Assist in writing proposals, and  giving formal presentations on basic lifting engineering procedures .

 

·                              Examine and evaluate test report for appropriate reporting for Lifting Gears/Equipment inspection.

 

·                              Prepare lifting inspection Plan  for  company projects and  also assist in developing Project Execution Plan .

 

·                              Saved 8% on supply costs by working closely with suppliers/procurement to ensure that all components met department quality standards.

 

·                              Compiled report of all daily activities and inspection on site and forward same  to the technical manager.

 

·                              Superve Torque/Bolting services during shut-down maintenace operation on ExxonMobil’s Platform- OSO PP, USARI, YOHO.

 

·                              Conduct Leak Test/inspection of SHR Buoyancy Tank for TOTAL’s USAN project.

 

·                              Possess working knowledge of relevant/Applicable Standards  for the implementation of RBI such as  API, ASME, BSI, LOLER and Local regulations.