Back to CV list
Olumuyiwa Idowu
Personal data and contacts will be open only to employers with access to CV database
Land surveyor/engineering surveyor/dimension control 1 500 000
Job Type: Part-Time , open to relocation

Education

From 0 to 2002
Federal School Of Surveying Oyo
From 0 to 1991
Olivet Baptist High School Oyo
Languages:
English
Afrikaans

Experience

Surveyor/Dimension Controller
Prime Service_ND FZE
April 2013 - Present Day (4 years 3 months)

Inspection/Supervision of fabricated structures and all mechanical components for Total E&P OFON Deck-3 and OFON Deck-5 projects; Total-EIFFELliving Quarters project; Chevron Domestic Obligation Supply Offshore (DSO) – MEREN & SONAM projects respectively; ensuring that all dimensions of fabricated structures are in conformance to clients/drawing specifications before and after welding; preparation of daily survey reports for inspections carried out on different the structures – (Jacket cans, Pile cans, flare bridge, platforms decks, flare tower, surfer landing e.t.c).

Project Surveyor
MPH-Lagarfe Cement Wapco plc
October 2009 - January 2012 (2 years 4 months)

Responsibilities:

As client representative, proactively monitoring different aspects of civil works for foundation preparation prior to construction of units in line with approved drawings/specifications. Establishing and Extending survey controls by standard methods, (in conjunction with contractors) to different areas a required for the project site for joint use. Performing Oversight function as project surveyor to handle all survey related issues on and off the project site for Lafarge- West African Portland cement Company Plc .Preparing working drawings and sketches (in AutoCAD format) from approved designed drawings in line with client’s specification. To ascertain the position and location of different units of designed structure before and after construction on the job site. Performing other functions as assigned by designated authorities

Surveyor Party Chief / Civil Supervisor
Devico (Agacox) Nig. Ltd_NLNG Expansion Project Bonny Island.
April 2003 - June 2007 (4 years 3 months)

Responsibilities:

QA/QC in Supervision of Civil & survey activities carried out by TSKJ sub contractors in the NLNG+ Project (Trains 4 & 5 and NLNG 6); Execution of survey activities required under the NLNG+ Plus project. Monitoring/Supervision of construction works (Civil/Mechanical) at Vocational Training School, Akiama Bonny Island. Supervision of construction works for road network within the NLNG expansion Projects (Trains 4 &5 and NLNG 6). Setting out of structures within the eastern contractors’ lay down area for TSKJ and other contractor(NLNG expansion project). Settlement monitoring activities for erected structure within the project area. Compilation/coordination of daily survey reports for activities carried out. Topographical data capture for site location of Proposed Train 7 (Mega 7+) for NLNG/TSKJ. Draughting and production of survey drawings in AutoCAD formats. As-built survey of Drainage and Road network within BCOT Tank farm for Shell Petroleum Development Company (SPDC) Bonny Island. Data Acquisition for Geographic Information System (GIS) for Bonny Utility Expansion project, using Ground Control Method.

Additional information

About Me

I aim to be a good team player of high level inter-personal skills for techno-managerial professionalism, possessing extensive experience in the act of Land and Engineering survey practices, with a dynamic organization; whilst applying accrued engineering and project management expertise to make tangible contributions towards achieving organizational goals.

Relocate: Yes