Back to CV list
Kenneth
Personal data and contacts will be open only to employers with access to CV database
Mechanical engineer
Job Type: Full-Time

Education

From 0 to 2010
Rivers State University of Science & Technology
From 0 to 2001
Nnamdi Azikiwe University Awka
No added languages

Experience

Facility Manager/ Project Engineer
Daystar Christian Centre
October 2008 - Present Day (8 years 10 months)
  • Responsible for compilation, execution and monitoring of facility departmental budget
  • Monitor all service level agreement (SLA’s) with all Contractors and ensure compliance.
  • Enforce quality control and quality assurance of goods and services.
  • Co-ordinate the maintenance and repairs of the HVAC systems, generators, and all domestic air conditioning systems in all the organization’s locations
  • Co-ordinate repair and maintenance of the office buildings, utilities, auditoriums and affiliate organizations, including the residence of the senior executives.
  • Successfully introduced Gate Pass System in all the facilities, this has reduced cases of missing equipments.
  • Quarterly inventory of all assets and properties of the organization in all locations.
  • Monitor insurance documents of all facilities and relevant gadgets to ensure prompt payment of all of premiums and monitor of claims.
  • Monitor and ensure strict compliance to safety policies, procedures, and standards.
  • Maintenance and repairs of all official vehicles.
  • Event planning, management and co-ordination, of all organisations programmes, both outdoor and indoor events.
  • Research and analyse new equipment, design, specifications, manuals, and other data to evaluate the Feasibility, Cost, Installation and Maintenance requirements of proposed Equipment.

Specific Achievements

  • Successfully co-ordinated the Project Planning, execution and completion of the Centralised Air Conditioning System for 5,000 capacity auditorium
  • Successfully supervised co-ordinated the installation and completion of centralised air conditioning system (HVAC) comprising: Chillers, Air Handling Units, Water Pumps, Water Treatment Plant, Dosing Tanks and other accessory machines
  • Successful supervision and installation of piping works which included the welding and non- destructive tests and insulation of pipes, for the water pipes, in the Centralised Air Conditioning System and Air Handling Unit
  • Successful supervision, and execution of the installation & synchronised heavy duty electrical generators with combined capacity of 2.5MVA.
  • Successfully introduced the Work Permit System. This has greatly standardized works carried out in all the facilities
  • Successfully introduced Gate Pass System in all the facilities, this has reduced cases of missing equipments
Production Engineer
First Aluminium
February 2006 - August 2008 (2 years 7 months)
  • Production planning, scheduling and control of production functions and processes.
  • Ensuring machine Overall Equipment Efficiency (OEE).at different machines centres
  • Planning and Executing of Preventive Maintenance of Machines viz: 4Hi Cold Rolling Mill, 2Hi Cold Reversible Rolling Machines, Hot Mills, Embossers, Annealing Furnaces, Powder Coating Plants
  • Troubleshooting defects & faults using Panel Logic Control (PLC)
  • Maintenance & Servicing of Hydraulic Systems, Pumps, Actuators & Valves, Pneumatic and Electro-Pneumatic Valves & Systems etc.
  • Maintenance of all Furnaces, and Ovens.
  • Maintenance of Blanking Presses used for Production of Circles, which serve as raw materials formaking Pots, Pans and Kettle.
  • Maintenance of fluid film rolls, Journals, and Bearings etc
  • Ensuring high Quality Products & Productivity.
  • Constantly addressing all production bottlenecks so as to achieve daily / weekly / monthly targets.
  • Maximise Production output per employee through Work study, Industrial Engineering and Line Balancing
  • Co-ordination of monthly inventory of finished products, semi finished and raw materials.

Specific Achievements

  • Superceded Production targets for the second (2nd ) and third (3rd) quarters of 2006
  • Part of team that designed installed and commissioned New Embosser Machine.

Part of the team that reactivated the cycle blanking Press in the first quarter (1st) 2007.

Maintenance Engineer
Tower Aluminium Nigeria PLC
October 2004 - January 2006 (1 year 4 months)
  • Co-ordinated yearly shut down maintenance services for all machines centres
  • Maintenance of 2,000 tons and 1,800 tons hydraulic extrusion presses
  • Maintenance of extrusion press accessory machines includes: Bailing machines, Die heating furnaces & Cooling towers.
  • Maintenance of Anodising Plant comprising: Hoist Cranes, Chillers, Boilers, Heat Exchangers, Smoke Suction Systems, Demineralisers, and Bath Tanks.
  • Maintenance of Aluminum profile powder coating plant includes: Powder Spraying Robots, Cyclone Motors,Demineraliser, Electric Motors,Automated Conveyors. Electric Ovens Burners.
  • Supervision and maintenance of Effluent Treatment Plant.
  • Maintenance of Heavy Duty Electrical Power Generators with combined capacity of 3.0MVA.

Maintenance of Fork Lifts, Air Compressors & Air-Conditioning systems.

  • Performing Quality Control and Quality Assurance tests.
  • Monitored and ensured high quality products (ISO 9001).
  • Co-ordinated and Supervised over eighty personnel work force

Specific Achievement

  • Part of Project Team that successfully completed the installation & maintenance of 1500 tons hydraulic extrusion press
  • Part of the team that assembled the miniature anodising plant for the plant coating section
Service Engineer
John Holt Engineering PLC
February 2002 - October 2004 (2 years 9 months)
  • Pre-inspection delivery of all generator sets.
  • Installation of electrical generator sets ranging from 27KVA -2000KVA
  • Routine servicing, maintenance &repair sof generator sets Viz:: Perkins, Volvo, Rolls Royce generators
  • Calibration of injector nozzles and repair of injector pumps
  • Outdoor repairs and maintenance of generator sets
  • Overhauling of all electrical generator sets.

Specific Achievement

Part of the team seconded to Deputy British High Commission offices and residences in Lagos