Back to CV list
Lateef Olu
Personal data and contacts will be open only to employers with access to CV database
Mechanical project engineer 350 000
Job Type: Full-Time

Education

From 0 to 2010
Obafemi Awolowo university Ile Ife, Osun state
From 0 to 2007
Federal Polytechnic, Ado Ekiti, Ekiti State
No added languages

Experience

Senior HVAC Engineer
Blue Ocean Technical services Ltd
September 2010 - Present Day (6 years 11 months)

A career minded Project (MEP) Engineer, with the ability to Design manually and with software, prepare the Bill of Quantity and manage HVAC, Plumbing and Electrical Project to Completion stage. I also have the ability to use difference kind of software for design like Cooling Load Calculator, Ductulator and HVAC Equipment selection software for Variable Refrigerant Flow/Volume {VRF or VRV}, Chill water System, Air Handling Units {AHU}, and Heat Recovery System with full understanding of Architectural drawing, Contract documents, Mechanical & Electrical Specification and usage of recent AUTO-CAD software, MS Project & Excel, analyze operations and implements plan that guaranty on-time completion of project, best and efficient safety work practices with technical and project management experience, wanting a career in a challenging, reputable and professionally run organization, where practical experience aimed at solving problems which can be obtained by working together as a team in order to achieve the organization’s goal as well become a fulfill Engineer in the nearest future.

Responsibilities;

·Reviewed engineering design proposals, design drawings, specifications and other technical document submissions and recommend improvements.

·Provided advice, guidance and also give physical support to the team of engineers and technicians involving all aspects of HVAC facilities design, construction, operation and maintenance or repair.

·Reviewed reports and studies to identify deficiencies and participate in the planning of construction/redesign programs.

·Utilized appropriate software and hardware tools to track load changes or other parameters of design, construction, operation and maintenance and repair.

·Provide instruction for the HVACLG-VRF Product for the trainee

Part of Projects list/ Achievements;

·National Petroleum Development Commission (NPDC) Building @ Benin by Nigeria Government (HVAC – VRF, Chiller and AHU) Prepared the BOQ and To be supervised by me (Just Awarded) Contract Sum: $ 2,800,140

·Makurdi International Hotel, Benue State (HVAC - VRV Multi-V Solo -11-storey); Design, BOQ Estimation and Supervision (ongoing), Contract Sum $ 1,000,000

·Coronation Shopping Mall, Abuja, Nigeria (HVAC- CAC - 7-storey Building); Design and Supervision (Ongoing) contract Sum $ 330,000

·Indian Embassy, Abuja, Nigeria (HVAC-VRF);Preparation of BOQ and Supervision (ongoing), Contract Sum $ 533,360

·Dominion Hangar at Airport, MMIA, Ikeja, Lagos, Nigeria (HVAC-VRF);Designed and Supervised (Completed), Contract Sum $ 160,008

·Mike Adenuga House, Banana Island, Lagos, Nigeria (HVAC-VFR); Design and Preparation of BOQ, Contract Sum $ 1,600,008

·Luxury Apartment @ Queen Drive, Ikoyi, Lagos, Nigeria. (HVAC- MPS and AHU) Design, Preparation of BOQ & Supervision, Contract Sum $ 586,696

·Stallion Hotel for MAB Global, Jabi District, Abuja (HVAC-MPS-9-Storey); Design, BOQ and Supervision, Contract Sum $ 1,286,731

·Estimation of the Bill of National Library Abuja (HVAC – VRF, AHU, & Chiller System) ; Contract Sum $6,667,000

·Channels TV New Station, Ogun State, Nigeria (MPS Design and Supervision); Contract Sum $ 173,342

HVAC Design and Cost Estimation Engineer
Air Conditioner Nig. Ltd
June 2010 - September 2010 (3 months)

Responsibilities;

· Provided HVAC Cooling Load Estimation and drawing / drafting

· Prepared Bill of Quantities for all designed Project

· Provided guidance, direction, and assistance to technicians working in related disciplines.

· Performed other duties as assigned by superior officer.

CELATOGAS CONCEPT NIG. LTD
Building Services Engineer
April 2009 - May 2010 (1 year 2 months)

Responsibilities;

· Coordinate Building services Engineering Design and Project.

· Interpreted blueprints and design codes to ensure that the project is done correctly.

· Determine and select the contractor to work in any designated site.

· Reviewed engineering design proposals, design drawings, specifications and other technical document submissions and recommend improvements.

· Provided advice and guidance to the team of engineers and technicians involving all aspects of HVAC facilities design, construction, operation and maintenance or repair.

Site Mechanical Engineer
Gani – Ola Engineering Services Ltd
June 2008 - March 2009 (10 months)

Responsibilities;

·Supervised the installation of underground Service duct and fibre optic cable within three (3) State concurrently (Ondo, Osun and Ekiti States).

·Responsible for the quality of a project and monitoring progress and systems to ensure that they are up to standard and will serve the targeted purpose.

·Interpreted blueprints and design codes to ensure that the project is done correctly.

·Determined and selects employees to work additional hours (over time) during a day.

·Supervised and monitored employees to ensure that the work is getting done efficiently, within quality standards and making changes to ensure that the work is completed on time.

·Making sure employees have tools and equipment needed for job in order to ensure a good output.

·Oversee the work and make sure it runs smoothly and as per the plan

Mechanical trainee staff
National Youth Service Corps.
March 2007 - March 2008 (1 year 1 month)

· Understanding the basic rudiments, uses and applications of AUTO CAD S and design.

· Learned Billing, Estimating, Report Writing and time management.

· Assisted with the supervision of various construction and modification works in compliance with the design from the Site Architects & Mechanical Engineer.

· Provided assistance with monitoring progress and providing an action plan where progress is behind program.