Back to CV list
Peter
Personal data and contacts will be open only to employers with access to CV database
Offshore Supervisor
Job Type: Full-Time , open to relocation

Education

From 0 to 2006
Nnamdi Azikiwe University Awka.
From 0 to 2013
Federal University Of Technology, Owerri
No added languages

Experience

Process Supervisor
Exterran Energy Solution Nigeria Limited.
August 2008 - Present Day (8 years 6 months)
  • Develop and execute process development activities and to support production for complex engineering projects/product lines.
  • Achieved 100% monthly production availability for SPDC at Otumara Gas Lift barge and Addax Petroleum development flow station in Izombe, Imo State.
  • Report daily production and service report to the operations manager.
  • Maintain parts requisition via ACCPAC/SERVICE MANAGER.
  • Support Quality control (QC) engineer in construction and modification phase.
  • Operations and maintenance of eight reciprocating gas compressor unit, two VGF H 24 gas generator engine, Perkins black diesel generator engine and atlas copco air compressor.
  • Support the cryogenic system engineering section, in the program for testing, commissioning and full time operations.
  • Provide the analysis and efficiency optimization for the cryogenic system.
  • Piping and instrumentation diagram interpretation, Isometric Interpretation, flow measurement, and data management.
  • Troubleshooting and diagnosis on field related equipments as well as PLC, DSM, TTD, TDXM, And Murphy Centurion panel.
HSE Officer
Exterran Energy Solution Nigeria Limited.
May 2006 - February 2007 (10 months)
  • Preparing job hazard analysis for the mobilization of personnel, material and equipment to site.
  • Involving in all job hazard analysis meeting between Addax Petroleum, Hanover and third party contractors.
  • Monitoring, and updating of Integrated Management Team (IMT)/Loss Preventive Team (LPT) activities through the use observation cards.
  • Audit and Inspection of site emergency equipments such as ambulance, emergency alarm system, smoke detectors and all the safety critical equipments on site.
  • Supervision of all lifting and welding within the facility.
  • Organizing QHSE meetings, toolbox talks and other QHSE Advices during operation.
  • Issuing of work permit system to operators on site.
  • Tracking and updating of individual sites Key Performance Indicators(KPI) and Key Recordable Indicators(KRI).
  • Preparing of all individual sites Quality, Health, Safety and Environment(QHSE) Performance Reports.