Planning/Project Control Lead
MAKON ENGINEERING AND TECHNICAL SERVICES, PORT HARCOURT.
May 2012 - Present Day (4 years 11 months)

Project Involved:

DOMGAS PROJECT COMPRISES OF 7-SITES

SOKU FLOWSTATION METERING UPGRADE PROJECT

BONNY AGS OLOMA PROJECT

UTOROGU NAGS PROJECT

AGBADA METERING NAGS PROJECT

ADIBAWA E & I PROJECT

RESPONSIBILITIES

  • Proactively contribute to all aspects of the work in order to achieve contractual requirements and to deliver timely and quality deliverables.
  • Review, analyse and validate schedules from Contractors for progress reporting. Ensure that reports delivered by contractors fulfil the requirements for schedule control and monitoring to suit the needs of the different stakeholders. Development of comprehensive schedules in various formats, as required.
  • Directing and coordinating the role of the Integrated Operations Planning Engineers.
  • Perform variance analysis in comparison to the baseline. Assist with schedule risk analysis and probabilistic reporting.
  • Oversee the planning element of the change control procedure.
  • Monitor and validate physical progress and planned VOWD report for the month.
  • Promote the use of the Integrated Operations Plan as the main tool for planning and managing the Assets, re-emphasize the need to follow correct procedures in relation to plan development and compliance.
  • Prepare/ analyse monthly risk and issues reports highlighting potential impacts to project baseline schedule and latest cost estimate to provide early warning indications.
  • Implement and maintain the Project Controls Processes
  • Lead, co-ordinate and manage planning and scheduling of the entire project in accordance with planning standards.
  • Establish and maintain Project Planning and Reporting procedures.
  • Provide input to the establishment and maintenance of the projects work breakdown structures (WBS’s)
  • Manage and steer the combined planning team effort and liaise effectively with project leaders, cost and project engineers.
  • Develop and drive the well drilling sequence, Well Location preparations and the required permits for wells development and production.
  • Study and Interprets Engineering (PEFS, P&IDs, Plot Plans) drawings to develop schedule activity lists
  • Monitor progress at agreed intervals, ensuring progress , deviations, and issues are reported accurately
  • Direct reports to the Project Managers and VP Facilities
SENIOR PLANNING ENGINEER
: RAS GAS LIQUIEFIED NATURAL GAS, RAS LAFFAN QATAR (www.rasgas.com.qa)
July 2010 - April 2012 (1 year 10 months)

Providing Project Control oversight covering Cost, Planning, Risks and Reporting to projects currently at define phase and being matured towards contracting and eventual constructions. Providing Support on Claims analysis and contract closeout for Ras Gas Liquefied Natural Gas Projects for Train 3/4/5/AGI.

RESPONSIBILITIES

  • Deploy resources on project with respect to project specific requirement.
  • Monitor Project delivery phases with a view to checkmating possible project deviation and promptly taking corrective measures.
  • Shutdown preparation and checking all activities connected to shutdown.
  • Manage all planning functions on the Project, in accordance with the procedures;
  • Develop Project specific procedures including Work Breakdown Structure and progress measurement methods in accordance with Company requirements;
  • Prepare Project planning, forecast schedules and progress reports.
  • Prepare level 4 schedules to forecast scenario for internal use by forecasting relevant construction & commissioning milestone dates.
  • Formulate tracking sheet (in Excel/ Spreadsheet) for each project incorporating target progress per week against actual quantities installed on site per pay/ week
  • Organize regular project progress meetings, carry out project progress analysis and make appropriate recommendations to engineers and management.
  • Negotiate with client during awards of additional jobs, variation, and project execution phases.
  • Monitoring of contractor’s activities related to construction, pre-commissioning & commissioning works from a detailed level 4 schedules using P3 & P6 Software
  • General Project material estimation for Piping projects, vessels, tanks and offshore and onshore structures.
  • Prepare Project execution plans, method statements, Manpower & Equipment deployment schedules and Organization Charts
  • Prepare multidiscipline Project Schedules on Primavera & MS. Project Planner and resource loading
  • Confirmation of material spec. and availability in local and international market.
  • Manage all planning functions on the Project, in accordance with company procedures;
  • Develop Project specific procedures including Work Breakdown Structure (WBS) and progress measurement methods in accordance with Company requirements.
  • Prepare Project planning, forecast schedules and progress reports
  • Organize planning and scheduling of engineering, Procurement and Construction projects.
  • Providing support to cost control group for running cash flows through manpower and quantity histograms.
  • Interfacing with various stake holders project definitions, Engineering, work package development, construction, Pre commissioning and Start Up.
  • Preparation of entire EPC schedules from scratch after consulting drawings and contract documents
  • Development of Shutdowns and tie-in schedules
  • Detailed critical path and schedule analysis
  • Monthly/weekly progress reporting
  • Formulation of percentage progress calculation methods for entire EPC projects

Head office based planning for engineering and procurement, Engineering progress and performance reports

  • Identification of trends/estimating and preparation and maintenance of cost control and trend reports
  • Formulation of quantity tracking systems , Installation S-curves for different commodities
  • Project Review presentations / Bulk material requirement planning
  • Identification of problem areas, formulation of action/contingency plans
  • Review and approval of vendors’/contractors’ schedules
  • Coordination with client, consortium partners and subcontractors (whichever applicable) to sort out schedule/claim related issues and helping management to solve several relevant problems
  • Maintain permanent communication with the Site manager and Planners on site about the progress of work