Back to CV list
Oghenekaro
Personal data and contacts will be open only to employers with access to CV database
Project Construction Manager
Job Type: Full-Time

Education

From 0 to 2001
University of Port Harcourt
From 0 to 1995
Federal University of Technology Owerri
From 0 to 1988
Metropolitan Secondary School, Isolo
No added languages

Experience

Senior Project Engineer/Coordinator
Morpol Engineering Services Ltd
April 2011 - November 2011 (8 months)
  • Manage and coordinate erection and installation of a Single Super Phosphate (SSP) plant and equipment dis-assembled from Offenbach Germany within a footprint of 14m X 14m and 45m high.
  • Assess requirements, recruit/procure, develop, mentor & manage the performance of all project resources, whilst assuring optimum utilization.
  • Provide development of construction plan, plot plan, equipment layout, piping routing, piping isometric, pipe support design, field mapping, and system schematics.
  • Carry out preliminary project risk assessment to identify and assess risks and uncertainties associated with project implementation and develop risk management plan and mitigation strategies for areas under consideration.
  • Construction of a 24” over 23KM gas pipeline.
  • Verify pipeline grades, sizes and wall-thickness for the various fluid/material transporting systems and verify pipelines against design and code requirements for installation, commissioning and operation.
  • Prepare material take off (MTO) and compile necessary requisition information for the procurement of materials.
Principle Consultant
EmeryPro Consultancy
November 2009 - April 2011 (1 year 5 months)
  • Project management processes and procedures development.
  • Project performance measurements and audits.
  • Project planning and scope development, schedule development, cost baselining, quality and risks management.
Site Manager
Rockson Engineering Nig. Ltd
February 2003 - November 2009 (6 years 10 months)
  • Interface with the various disciplines for project construction, installation, pre-commissioning and testing of equipment/machines in the construction of 75MW Power Station.
  • Evaluate reports and document submissions; liaise with clients, contractors, manufacturers and components suppliers.
  • Monitor verifiable activities/task against schedule and compile reports and appraisal.
  • Formulate and develop conceptual project engineering design into functional scopes of work in power plant installation.
  • Technical assessment of Sapele Station with a view to highlight the requirement for a complete revamping of all machines and equipment, consisting of:

6*120 MW BBC (ABB) steam Turbines and 4*75 MW BBC (ABB) Gas Turbines.

6 boilers (Babcock) with individual capacity of generating High Pressure (HP) 4.35m3 steam at 120 0C, 181 bar and Low Pressure (LW) 4.05m3 steam at 120 0C, 28 bar.

  • Ancillary equipment including boiler feed pump, water treatment plant, deaerator unit, booster pumps, FD fan drives, condensate extraction units, lubricating oil coolers, etc.
Service Engineer
Walvis Nig Ltd
December 2000 - February 2003 (2 years 2 months)
  • Ensured maintenance objectives are achieved, i.e. preserve company assets, ensure facility’s integrity over life-cycle, and ensure optimum performance under the combined aspect of maintainability and maintenance support.
  • Supervised complete overhauling of a wide range of Diesel engines (Caterpillar, Daihatsu, Watsila, MWM, Detroit, Cummins, Perkins, GM), Pumps (centrifugal/rotating/reciprocation), oil-water separator (purifiers), Hydraulic winches, air compressors, Gears, Propeller shaft (controllable and fixed pitch), as well as pipes and fitting installations.