PROJECT/INTEGRITY ENGINRER
ENG RYPAC LIMITED
November 2011 - Present Day (5 years 4 months)

JOB DIMENSION

I am presently responsible for managing all offshore maintenance campaign as a project engineer and a painting inspector as well as on-shore pipeline activities projects (Pipeline/end Facilities) within agreed budget, schedule, and statement of requirement and in compliance with company objectives and HSE rules.

Project budget: up to USD $ 4 million.

Direct Subordinate position: Site Supervisor Team, Material Coordinator, QA/QC Inspector/Engineer.

ACTIVITIES

  • Plan, lead and co-ordinate projects activities from initiation, through work scoping, engineering and design, tendering, execution engineering, execution to hand over.
  • Initiate, establish project consolidated planning and coordinate the progress control activities associated with the establishment and management of overall project schedule and individual contract work time schedule.
  • Use company rules, guidelines and procedures and best work practice to establish a set of procedures suitable for the controlling of the project.
  • Prepare project estimates/budgets and the plans for work including extra work s, follow the cost control process and ensure projects are executed in line with approved budgets.
  • Participate, monitor, organise and drive projects contract activities including prequalification, call for tender preparation, tendering evaluation and ensure award recommendations are made in the best technical and commercial terms.
  • Prepare, manage the projects execution plan(Basic/detail eng., Construction work)
  • Follow up engineering studies, procurement works and contractor’s activities. Review/comment all Engineering/LLI contractors’ activities (with the coordination of Company and Head office discipline specialist team.
  • Define, mobilise and coordinate the activities of various site supervision teams and contractors on project and ensure project is executed in line with the project objectives (cost, Targets, etc) in adherence to quality and safety requirements.
  • Identify deficiencies, issues/problems that cause delays, recommend solutions and derive approved remedial actions.
  • Provide project consolidated reports to Projects Management, and control the internal and external reporting with other dept, company Head offices and external authorities.
  • Maintain contact with hierarchy, head office, Vendors, contractors and resolve all the technical and contractual issues.
  • Hand-over fully documented and commissioned installations to operations/PROD start-up team.
  • Prepare documentation for the overall project reporting where and when required.
  • Establish and drive company corrosion control schemes and management strategies for all onshore and offshore pipeline grid
  • Assess and compile data from sampling programmes for risk ranking of pipeline grid and carry out corrosion risk assessments and risk ranking for offshore pipelines (special duties)
  • Develop and enhance Company’s subsea pipelines asset integrity programmes and strategy for Company’s infrastructure and environment.
  • Supervision/coordination and company rep in matters pertaining the execution of ODD AND BRIDGE (a painting campaign for TOTAL E & P Nigeria’s Odudu Offshore Production Platform)
  • Review Schedules and Planning of Job activities for both internal and clientele and the schedules produced by the tenders and contractors.
  • Organize Project-Time management, analyze progress and performance data and present findings in priorities for

adequate management information.

  • Reviews operational status reports and performance audits, provides advice and initiates actions to create improvements and resolve issues.
  • Establishing “Planned and Preventive Maintenance” PPM programs and procedures after project closure.
  • Reporting project status at progress meetings.
  • Ensuring all resources (manpower and materials), are provided as per the contractor’s scheduled plan, meet all KPIs, and SLAs on time and within budget.
PROJECT ENGINEER/PLANNING
OILSERV LIMITED
January 2008 - October 2010 (2 years 10 months)
  • Planned, initiated, established project consolidated plannings and coordinated the progress control activities associated with the establishment and management of overall project schedule and individual contract work time schedule.
  • Reviewed enterprise planning and alignment of planning approach to take into account project WBS and AFE’s for the 128km Gas Transmission Line to UNICEM Plant.
  • Reviewed the PEP and developed work planning and procedures with respect to project resource and task area.
  • Organized tasks and schedules into phases, set interim deadlines and constrain tasks, undertake the pre-mobilization inspection of equipment, machinery and materials, analyses all engineering variations with respect to the scope of work not covered by the contract and access the relevant costs and implementation.
  • Management of System Enterprise Resource Planning.
  • Interpret the facility designs and installation procedure with the applicable industry codes and standards, establish the detailed procedure for job execution and review the detail engineering design as well as specifications for construction hence confirm it suitable as to the practicability to the point of view.
  • Endorsed all field job notifications, review the WPS, SMR, WBS, dispatch project as-built dossiers, hand over certificates, etc.
  • Appraised the stress analysis of piping systems in conformance with project requirements, design parameters, codes and industry practices;
  • Signs out the Permit-to-Work
  • Compiled calculation packages for each system analyzed and resolving field construction queries.
  • Implement and oversaw on-site-work on daily bases, audit all safety, environmental and quality requirements, prepare and monitor detailed resource plans and schedules, manage daily site industrial relations, monitor the project as required and assure adherence to schedules, records and reports work progress.
  • Ensured correct settings of the MPS4000 automatic welding machines (orbital weld head for multi pass GMAW/FCAW Pipe Welding), set the precision tools for perfect, repeatable welds, and monitor the deposition rate without sacrificing quality.
  • Coordinates over a 100 personnel on site including sub-contractors.
  • Reported to the Project Manager
QA/QC ENGINEER
INCO INSPECTION
January 2004 - January 2008 (4 years 1 month)
  • Adequately supervised most pressure testing process, coating/painting/wrapping of major pipeline construction and other facilities to the benefit of my company.
  • Ensured adequate implementation of quality and professional control on production welding and inspection, installation of ICCP to weldments.
  • Designed and specified piping, valves, and pipe supports for major (N300 million) construction projects.
  • Created models and carried out QA processes that eliminated majority of change orders.
  • Evaluated and approved new vendors and suppliers, as well as new technologies.
  • Consulted with divisions worldwide on design issues and field installations.
  • Represented company at domestic tradeshows as a rep to technical consultant.
  • Developed cost reduction programs in several areas that resulted in 20% - 35% savings in specific product areas as well as in overall company operations.
  • Supervised several inspection of various pipeline constructions and maintenance; both land and swamp oil, gas & water flow lines: Virgin Production lines, Sectional Replacements, Leak Repairs by clamping, Screw Plugging and Branch fittings using Hot Tapping Process.
  • Prepared PQP for projects, planned prepared and conducted first and second party audits.
  • Conducted contractors and sub-contractors technical evaluations/Audit and ensured that Quality Audits programs are maintained
  • Performes QA/QC surveillance site Audit activities.
  • Coordinated welder qualification test (WQT) and procedure qualification test (PQT).
  • Prepared QA/QC deliverables documents for Projects and Tendering (e.g. PEQP,CQP, ITP, WP,HTP,QIP etc)
  • Carried out radiographic and MPI activities/inspection in full compliance with client/international operating procedures and standard.
  • Supervised pressure testing, field joint coating and holiday detection operation.
  • Received inspection / verification of welded/fabricated parts and welding consumables procured by suppliers.
  • Ensured all QA matters relating to projects meet requirements.
  • Ensured adherence to quality assurance and control procedures, standards and codes governing the projects.
  • In unification with engineering principles, I developed and controlled project quality plans.
  • Managed and controlled all QA/QC documentation relating to projects.
  • Developed corrective measures to follow up on effectiveness and sustainability of corrective actions.
  • Helped various disciplines understand material properties and requirement.
  • Ensured that measures are taken in order to identify and prevent acceptance of defective materials.