chibuzor
Personal data and contacts will be open only to employers with access to CV database
Project engineer 500 000
Job Type: Full-Time , open to relocation

Education

From 0 to 2001
university of nigeria, nsukka
Languages:
English

Experience

Project Engineer/ Country Manager, Operations
Mobi Energy Global Ltd
June 2013 - Present Day (3 years 10 months)

A new indigenous sea bed to surface oil services contractor.

Project Engineer
Tonniewinner Ltd
October 2012 - March 2013 (6 months)

SUPERVISING PROJECT ENGINEER: Notable project handled includes

1) Construction of Perimeter fence, gate house, transformer plinth, foundation for circuit breaker,

ct, vt, isolator & lighting arrestor, auxiliary transformer, pavement, cable trench and parking lot at

proposed 1X15MVA, 33/11KV INJECTION SUBSTATION at Eliozu Community, PH for Tonniewinner Ltd subcontractor to Income Electrix Ltd

2) Completion of remaining civil works (power house, cable trench, plinths for CB, isolators, transformers) on site for proposed upgrade of power project at NAOC Base PH for Tonniewinner Ltd subcontractor to Income Electrix Ltd

regional engineer-south East/ Onne depot coordinator
Forte oil Plc ( african petroleum plc)
November 2004 - August 2012 (7 years 10 months)

depot/utilities engineer (Apapa installation November 2004 to October 2007) - maintenance engineer handling depot equipment(pumps, bulk meters, generators, loading facilities, steam boiler, electrical panels, surface storage tanks, offices equipment.

Pioneer depot engineer (Onne depot, october 2007 to august 2010)-supervision of final phase of depot tankfarm construction, installation and commisioning of equipment(pumps, generators, bulk meters, surface storage tanks etc. supervision of fuel loading operations in the depot.

Regional engineer-south east (Port harcourt, august 2010 to august 2012) - supervision of maintenance activities in 53 AP PLC owned fuel stations in 8 states in south region. Equipment includes dispensing pumps and meters, generators, electrical panels, surface and underground storage tanks etc.

Onne Depot coordinator (Onne, October 2011 to August 2012)v Depot coordinator in charge of day to day receipt, storage and dispensing of AGO (Diesel) in AP PLC Owned (15 million Litres storage depot) Onne.

v Coordinating Safety, security, product inventory, quality assurance officers in the depot.

v Acting as Depot Engineer in charge of engineering, maintenance activities on depot facilities and equipment during the period as there was no engineer hired by the company.

Additional information

About Me

PROFILE:

A well-behaved, organized, obedient and honest Mechanical Engineer with excellent communicational skills as well as team work spirit. In the course of my career, I have been fully active mainly in fuel depots and retail outlets' maintenance, operations and construction (project management) in the downstream oil and gas sector . I have a keen interest in industrial equipment and facilities' maintenance planning and implementation; also in project management which I'm training on and wish to be a specialist in that sector. I have developed good work coordination, monitoring and supervision to meet set and agreed targets.