Toluwalope
Personal data and contacts will be open only to employers with access to CV database
Project / facilities engineer 6 000 000
Job Type: Full-Time

Education

From 0 to 2005
Ladoke Akintola University of Technology, Ogbomoso
No added languages

Experience

Facilities Management Officer
Oando PLC
April 2011 - July 2012 (1 year 4 months)

Key Responsibilities and Achievements: Key personnel involved in carrying out activities that ensured the delivery of the most suitable office working environment and functional guest houses nationwide through effective facilities maintenance and management operations. Managed office improvement/re-modification and guest-house acquisition & set-up projects with over 75% success rate.

Projects:

  • Office Remodification/Refit Projects {In OANDO Head Office – 9th and 5th Floor}

Involved in project planning and designing. Interfaced with procurement and end users to ensure deliverables were delivered timely. Supervised construction and installation activities. Carried out Quality Control inspections, Commissioning reworks where necessary. Prepared / Maintained Project Schedules & Work plans.

  • Office Space/Guest House Acquisitions and Set-Up Process {For OANDO – Lagos, Kwale, Port Harcourt}

Involved in defining needs/specifications/scope, Conducted Inspection activities, Defined set-up items and interfaced with procurement to ensure prompt achievement of deliverables. Prepared/Updated Project Schedules &Work plans.

Generic Duties:

 Day-to-Day Management of facility spaces to ensure it remains safe, secure, and well-maintained.

 Supervision of all FM vendors, to ensure maximum service delivery as contained in the Service Level Agreement.

 Supervision of re-modification/ fit out projects.

 Prepare Monthly reports on the audit of facilities within area of responsibility.

 Develop effective service delivery processes (from request orders, to service scheduling, service procurement to delivery and customer relationship management).

 Ensuring the work space meets Environment, Health and Safety requirements

 Planning best allocation and utilization of space and resources for new buildings, or re-organizing current premises

 Proactively ensures the continuous availability of all materials necessary for the smooth running of the FM business.

 Identifies, evaluates and develops annual facilities management plans to support business and operational needs based on requirements stated in the business plans and budgets of individual entities and departments.

 Responding appropriately to emergencies or urgent issues as they arise.

 Supports the preparation of purchase requests, LPOs, and work orders related to facilities management and other general administrative services.

Estate Officer
Lafarge Cement WAPCO (Nigeria) PLC
February 2011 - April 2011 (3 months)

Key Responsibilities and Achievements: Responsible for ensuring proper and cost-effective operation of facilities in 2 estates. Developed framework, systems, procedures, policies and tools for the effective management of facilities. Was able to reduce turn-around time for estate management issues by 50%.

Generic Duties:

 Responsible for the day-to-day running of all estate unit

 Ensured compliance with approved estate budget through reduction of waste

 Developed, organized and implemented estate maintenance programme

 Ensured availability and usability of the estate golf course

Head, Facility Management
TOBAKS Properties Venture
October 2009 - January 2011 (1 year 4 months)

Key Responsibilities and Achievements: Was involved in providing Total Facility Management direction, planning, implementation, control and audit for an estate of 43 housing units. Prepared proposals and budgets to bid for new sites. Undertook allied Contract/Service Administration and Logistics/Supply Chain operations. Managed costs under a tight budget and unpredictable cash flow.

Generic Duties:

 Responsible for the day-to-day running of all of aspects Facility Management and Maintenance in estates being managed by the organization.

 Prepared and monitored Budgets for the Facility Management and Maintenance operations in managed estates.

 Created/prepared policies and procedures to guide operations. Constantly reviewed execution to determine areas of non-conformances in order to effect corrective actions.

 Prepared, Specified and Reviewed Facilities and Equipment. Where replacements are required, make inquiries from vendors and set-up procurement process. Plan and Execute projects necessary to effect upgrades and refurbishment.

 Frequently performed Life Cycle Analysis on utilized site Facilities to determine the Facility Condition Index (FCI), leading to continuation of maintenance (preventive or breakdown) or outright replacement.

 Prepared and set-up Health, Safety, Environment & Security Standard Operating Procedures, and Policies with aim of preventing all LTI, Near Misses, Fatalities, LTA and the likes on site.

Project Engineer
Ascot Fabricators and Constructors Nigeria Limited, Port Harcourt, Rivers State
February 2008 - September 2009 (1 year 8 months)

Key Responsibilities and Achievements: Performed vital engineering, planning, bidding and project management activities. Functioned in supervisory capacities both in the fabrication workshop and various external sites.

Projects:

  • Nembe W11S Flowline Testing / Odeama W13L/S Flowline Testing and Blinding. {For SPDC}

Site Engineer; Supervised&Co-ordinated Skilled/Non-Skilled labour, Prepared /Maintained Project Schedules & WBS, Performed Engineering Calculations, Site Drawings, and QC Inspections. Prepared Work Procedures. Prepared Site Reports. Controlled Material Usage and Requisitions.

  • Izombe Flowstation Gas Flare Down OML 124{For Addax Petroleum}

Involved in preparing Bidding&Tendering documents and other required Project documents. Prepared / Maintained Project Schedules, WBS and Plans. Involved in Cost Analyses, Procurement and Workshop Fabrication. Actively participated in the design review and modification of all pipeline, piping and process drawings. Involved in the creation of construction plans and supervision.

  • Shorelink Tank Farm Construction {For Shorelink Oil&Gas Limited}

Involved in preparing Bidding&Tendering documents and other required Project documents. Prepared / Maintained Project Schedules, WBS and Plans. Involved in Cost Analyses, Procurement and Workshop Fabrication. Participated in the review and modification of all pipeline and piping drawings. Participated in QC Inspections. Involved in the creation of pipeline construction plans and supervision.

Generic Duties:

 Preparation of Bids, Tenders, Pre-Qualification and Pre-Mobilization Packages.

 Project Definition, Planning, Scheduling, Modification (Schedule Control), Monitoring and Reporting, Control, Liaison and other ancillary Project management/contracting activities.

Graduate Engineer
Ascot Fabricators and Constructors Nigeria Limited, Port Harcourt, Rivers State
February 2007 - February 2008 (1 year 1 month)

Key Responsibilities and Achievements: Key personnel in planning and executing projects in flowline/pipeline engineering alongside performing planning, bidding and project management activities, either as a support or supervisor.

Projects:

  • Orubiri W7L/S Flowline Replacement {For SPDC}

Site Engineer; Supervised&Co-ordinated Skilled/Non-Skilled labour, Prepared /Maintained Project Schedules & WBS, Performed Engineering Calculations, Site Drawings, and QC Inspections. Prepared Work Procedures. Prepared Site Reports. Controlled Material Usage and Requisitions.

  • Santa Barbara Flowstation Lifting Equipment Procurement, Installation and Commissioning {For SPDC}

Prepared / Maintained Project Schedules & WBS. Involved in Cost Analyses, Procurement and Workshop Fabrication.

Generic Duties:

 Preparation of Bids, Tenders, Pre-Qualification and Pre-Mobilization Packages.

 Project Definition, Planning, Scheduling, Modification (Schedule Control), Monitoring and Reporting, Control, Liaison and other ancillary Project management/contracting activities.

 Co-ordination, Engineering and Supervision of Flowline Testing, Repairs, Construction and Replacement, along with other outfield projects.

 Preparation of Site Reports; relating them to Schedule and Non-Conformances in order to take proper, necessary and appropriate remedial / corrective actions. Performance of site leadership activities in the light of set goals.

 Interpretation of Engineering Drawings for construction and costing purposes (MTO and BoQ).

 Planning and supervision of Workshop construction

 Preparation of As-Built Documentation and Drawings.

Trainee Engineer
Ascot Fabricators and Constructors Nigeria Limited, Port Harcourt, Rivers State
March 2006 - January 2007 (11 months)

Key Responsibilities and Achievements: Performed as vital support for planning, fabrication and construction activities.

Projects:

  • Inda Production Platform Spools -Wemco Discharge Line Replacement {For Chevron Nig. Ltd.}

Prepared/Maintained Project Schedules&WBS. Involved in Costing, Fabrication&Fit –Ups, Reporting and QC activities.

  • North Apoi Jacket ‘G’ Gas Lift Skid and Pipes (Modification) {For Chevron Nig. Ltd.}

Prepared/Maintained Project Schedules&WBS. Involved in Costing, Fabrication&Fit –Ups, Reporting and QC activities.

  • Funiwa LQ IT Dish Mounting Platform Fabrication {For Chevron Nig. Ltd.}

Prepared/Maintained Project Schedules&WBS. Involved in Costing, Fabrication&Fit –Ups, Reporting and QC activities.

Generic Duties:

 Provide support for preparation of Bids, Tenders, Pre-Qualification and Pre-Mobilization Packages.

 Planning and supervision of Workshop construction.

 Provide support for planning/scheduling and other ancillary project management activities.

 Interpretation of Engineering Drawings for construction and costing purposes (MTO and BoQ).