Kolawole
Personal data and contacts will be open only to employers with access to CV database
Project manager 800 000
Job Type: Full-Time

Education

From 0 to 1997
University of Port Harcourt
From 0 to 1990
The Polytechnic, Ibadan
No added languages

Experience

Deputy Manager
PPC LIMITED
September 2001 - Present Day (15 years 9 months)

SNEPCO, 21/22 Marina Street, IT(Telecoms) Department, Lagos Island, Lagos,

Deputy Manager, PPC/SPDC/SNEPCO Maintenance Projects

  • Installations and Maintenance of Switching equipment (ALCATEL 4400 & ERICSSON MD110 pabx)

in Lagos and other connected Nodes.

 

 

Total E& P Nigeria Limited, IST (Telecomm) Department,

Plot PC 1415, Ademola Adetokunbo Street, Victoria Island, Lagos.

Deputy Manager, PPC/TOTAL E&PNL Projects

  • Installation and Maintenance of Microwave Digital Radio Link(MDL 2000), Airspan Microwave

Training & Workshops attended: 

 

· Effective Project Management.

· Installation of RFS CELLFLEX cables (Part 1 & 2)

· Data Sheets for RFS CELLFLEX accessories (Part 3).  

· Occupational Gestures and Postures Training - 4640 by MANCHON Romain at TUPNI HSE; TOTAL

· Fire Wardens and Fire Safety Awareness Training by Falck Nutec, FALCK Prime Atlantic; TOTAL

· AED Awareness Workshop Training by Company Clinic; TOTAL

· Healthy Living Awareness Campaign 2008 by Dr. E.L. Bamgboye Consultant Nephrologists & Hypertensologist; TOTAL

Certificate in Managing Health, Safety and Environmental in Contracts by Mr. Obiefuna ILOANUSI, GM, HSE Department; TOTAL.  

 

Radio Link, VHF Trunked Radio (Repeater station), Maintenance of Alcatel PABX, Maintenance of data network structural office cable.

ICT (Telecomm) Department, NAOC Ltd., Plot PC 23, Engineering close,

Off Idowu Taylor street, Victoria Island, P. O. Box 59810, Ikoyi, Lagos.

Senior Engineer, PPC/NAOC Projects

  • Maintenance of Trunked radio equipment such as Startsite Central
  • Controller, Motorola Business Exchange, Quantar Repeater Stations, Smartnet II.
  • Repairs of Trunked hand portable and Maxtracs base radio.
  • Installations and maintenance of TDMA IRT 2000 -modular system;
Maintenance Engineer
Dolphing Engineering Ltd.
January 2001 - August 2001 (8 months)
  • Maintenance of PABX KX-T123211 (Panasonic PABX)
Telecom Engineer S.P.D.C. Project
Comm. Associates of Nig. Ltd
January 1997 - October 2000 (3 years 10 months)
  • Programming, Installations & maintenance of mobile and hand portable radios.
  • Installation and maintenance of hf radios.
Project Telecom Engineer
Akatek Nigeria Limited
October 1995 - December 1996 (1 year 3 months)
  • Installation and maintenance of PABX KX - T123211for management hot lines.
  • Structural office cabling.
Project Electrical Engineer
Daiik Engineering Group
February 1994 - September 1995 (1 year 8 months)
  • Consulting Engineers, Electrical & Mechanical Engineers, Project Managers.
  • Design of Electrical installation such as lighting points, power points and Schedule of electrical equipment.
  • Electrical installations (conduit wiring) at shell Gme’s house (R.A.) Port – Harcourt and Mobil Technical

Training Centre building, Eket.

Project Electrical Engineer
Abas Engineering Works
September 1991 - January 1994 (2 years 5 months)
  • Residential Electrical installations, including domestic and recreational facilities (Conduit and surface wiring)

at Elf residential area, UAC fast-food (Mr. Biggs, Azikiwe Road), Port - Harcourt.

  • Rural Electrification High/Low Tension - (33kva/11kva), Ikare – Akoko, Ondo State.