Back to CV list
Anthony
Personal data and contacts will be open only to employers with access to CV database
QA/QC
Job Type: Full-Time

Education

From 0 to 2002
Petroleum Training Institute
No added languages

Experience

QA/QC
Mobil Producing Nigeria Unlimited.
May 2012 - Present Day (4 years 10 months)

I oversee the overall Mechanical Installation, Fabrication, Welding and NDT Inspection and verification within Brown field scope of work of all quality activities on MPN-Platforms (USARI & UBIT GY).

These activities consist of: Setting & maintaining scope of project quality management system; Monitored day to day Construction activities and ensuring quality compliance with Project Specifications; Implemented Quality Control Procedure Manual Processes for conducting day to day operations, test & inspections of products (Welds); Evaluated Quality & Performance as per MPN Specification; Reviewed associated supplied equipment’s and making sure quality assurance record are documented; Monitoring & inspection of piping (mechanical) installation, Deck platform modification, Hook-up riser installation; Ensure that surveillance inspections are continually carried out on the project recording & documenting any & all deviations from the Project Quality Program (PQP) & Company Integrated Management System (IMS); Developing & implementing risk based inspection activities & processes, identifying & developing remedies on how to rectify inspection gap issues, Monitoring the pressure testing (leak test) & nitrogen purging operation of the piping & process system, Identification of any quality problems & recommend changes in quality standard where necessary; Witness, Monitor & Interpret Laboratory Test Results of Mechanical Test and Chemical Analysis of a fabricated Access Platform (Test Specimens selection from the Webs of Beams & Channels); Review all NDT report.

N.O.P.L Site QA/QC Engineer / Coordinator
Total Exploration and Production Nigeria Limited
August 2011 - April 2012 (9 months)

As a Site QA/QC Engineer and Coordinator my responsibilities is variable. I support the Quality department by initiating & performing the duties listed below as required, as well as other responsibilities assigned by Project Quality Manager. My responsibilities consist of: Manage & oversee Project Quality to ensure compliance to procedures & CPY specification, Review of Project Quality Procedures at the early stage & analyses current procedures; Plan duties within the QA/QC group to execute QA/QC activities; Review prepare material selection reports and material procedures; Delegate & assign tasks to QC Inspectors & create the enable working & cohesive term; Review fabrication procedures requirements including NDT of the pipe line and components; Ensure that detailed Quality related activities are undertaken on the project & assure that the product offered by the CTR construction term complies with the contractual requirements; Report Project Quality status to the Quality Manager; Monitor and audit the quality activities performed by the Contractor in the area of engineering and construction; Developed and implemented the Internal Compliance Audit Program; Developed and implemented the Quality Management System Training Program for the Project Team; Ensuring that technical solutions exactly match the standards or CPY specification; Verify that all quality problem on service & material have been alleviated & stopping further processing of any work until the quality problem has been corrected; Provide support & advice to the CTR construction personnel in relation to PQP & IMS; Performed CPY line pipes hand over to CTR & delivery from Onne FLT to CTR base & NOPL camp; Monitoring of ROW bush clearance & top soil remover & stringing of pipes; Pre-inspect & review the calibration status of all test equipment being utilized on the project; Monitoring internal audit perform by CTR QA/QC dept. on CTR Engineering dept. Actively participate in pre-construction meetings, participate in pre-inspection meetings and provide technical assistance to support the contract.

Deputy QA/QC Manager
Delattre Bezons Nig. Ltd. (DBN).
April 2011 - August 2011 (4 months)

I was employed by Delattre Bezons Nig. (DBN) Ltd. Deputizing for the Project Quality Manager. I oversee the Fabrication, Welding and Inspection of AKPO / USAN Super-Duplex Subsea Production Jumper & Jumper Lifting Frames. I assisted the Project Quality Manager in performing day to day quality related activities & in some capacity deputize for the Project Quality Manager when needed; I established Project Organization Chart of the QA/QC Department (Supervision); Witness, Monitor & Interpret Laboratory Test Results of Laboratory Mechanical Test/Macro Examination and Chemical Analysis of USAN Jumper Fabrication Branch Weld Test Samples; I managed the multidisciplinary team of Supervisors and Inspectors; Managed Quality interrelationship with the client, project partners & subcontractors; Participated in establishment of Quality documentation for the Project’s Procurement; Organized and Supervised Inspection activities; Coordinated Non-Conformity issues between Construction and Supervision Team; Established and Maintained Quality Records in conformance with contractual terms; Developed and implemented the Internal Quality Management System Compliance Audit Program; Ensured that all necessary inspections as identified in the approved inspection & Test Plan (ITP) are attended to; Monitor all tests (Gas testing, Load tests, Lift tests, Load-out activities); Review all NDT report, Conduct Positive Material Identification (PMI), Hardness test & Ferrite test; Attend & participate in all requires project meeting.

Quality Site Rep.
Total Exploration and Production Nigeria Limited
March 2010 - April 2011 (1 year 3 months)

As CPY Quality Site Rep my responsibilities is variable. I covered the following activities: Maintain standards of safety & comply with CPY’s Health, Safety & Environment management system requirements; Verify procurement of material compliance with Code & Design Specification & Ensure procure material and equipment are traceable & met quality standard; Monitor the construction & fabrication of 15 pressure vessel (11 carbon steel & 4 clad vessels) specified by Total Specification; Manage & oversee Project Quality to ensure compliance to Codes, Standards & Quality Program requirements; Carried out Audit on CTR Engineering department, Document Control department, Procurement department & Material department. I attend all meetings as directed by company & any other duties assigned by CPY from time to time.

QA.QC
Saipem Contracting Nig. Limited.
September 2008 - February 2010 (1 year 6 months)

I worked as QA/QC, I mainly follow-up the construction activities and ensure the contract applies by coordinating all quality activities with Construction Superintendents, Supervisors and Foreman. Coordinated inspections and testing activities related to construction works; Managed execution of construction activities in respect of scheduled priorities; Coordinated Technical Issues between Projects team and Design Consultants; I carried out Quality Assessments & Review of all approval Welding, NDT, Coating procedures and related drawing. I ensure all welding operations are executed in accordance with all relevant codes of Practices and Company Procedures and Practices. Issues the relevant quality records and when necessary verify conformity of the work to Specified Quality Requirements and ensuring that the inspections and controls are carried out and documented in accordance with the Quality Management System.

QA.QC Lead.
Zakhem Construction Nigeria Limited
March 2006 - August 2008 (2 years 6 months)

I was employed as the company QA/QC Coordinator; Responsible for the onshore pipeline projects coordination. I mainly supervise the pipeline construction project quality wise as specified by NGC Specification. I supervise multidiscipline inspectors & NDT technicians to ensure quality control activities on site are executed in accordance to project requirement and their safety at work. Preparation and review of QC procedure, Inspection test plans to project specific requirements, Responsible for preparing welding procedures and organizing WQT. Also responsible for managing, co-coordinating and allocating Company QC personnel, Inspectors and specialists to specific tasks during the construction, fabrication, installation and pre-commissioning activities. I ensure all quality control documentation is compiled and competed for as-built hand over through the QC turnover engineer.

QA / QC.
Willbros Nigeria Limited
August 2000 - January 2006 (5 years 5 months)

I was employed as a QA/QC Inspector on their various Onshore & Swamps projects, Offshore and Subsea equipment maintenance projects. This projects are not limited to Topsides fabrication, Flare tower fabrication, Riser I-tube & Riser protection supports fabrication, Boat landing fabrication, Flare piping fabrication, Helideck fabrication, Clamps fabrication, Gas pipeline construction, Jacket construction, Deck construction, Riser spool fabrication, Process piping spool fabrication, Hook up arm fabrication, Wellhead Platform construction & Subsea equipment inspection such as Subsea Clamp (SB Clamps, IWOCS Clamps), Optima Subsea Connector, Valves etc. for clients like Shell, Exxon Mobil, Total, Addax, NLNG, Belbop etc.