Senior Electrical Engineer 200 000
Job Type: Full-Time

Education

From 0 to 2005
UNIVERSITY OF PORTHARCOURT
No added languages

Experience

PROJECTS ENGR
INTEGRATED ENERGY SERVICES LIMITED
January 2010 - Present Day (7 years 6 months)

Position: Project Engineer:

Client: Total Exploration Production Nigeria Ltd

Projects Executed:

  • Detailed Engineering Design For OML 100 Afia and Ime Anti-Scale injection pump (Electrical and Instrumentation Works) for Total Exploration and Production Nigeria Ltd (TEPNG)
  • Detailed Engineering Design For OML 58 Remedial Works on 4Bar/9Bar Compressors at Obagi Flow Station for Total Exploration and Production Nigeria Ltd (TEPNG)
  • Detailed Engineering Design for OML 99/AMP1 Connection of Test separator to atmospheric separator For Total Exploration and Production Nigeria Ltd (TEPNG)
  • Detailed Engineering Design for OML 100 & 102 (FSO & ODUDU Unity) Installation Of General Alarm Installation for Total Exploration and Production Nigeria Ltd (TEPNG)
  • Detailed Engineering Design for OML 58 Obagi Test Separator Metering Improvement for Total Exploration and Production Nigeria Ltd (TEPNG)
  • Installation Of Quick Closure System at OML 58 Ibewa 17, 18 and 19 for Total Exploration and Production Nigeria Ltd (TEPNG)
  • Piping and Instrument Drawing Design, Construction, Well Hook-up and Commissioning of Single Well Head Manual Control Panel with ESD Shutdown For Total Exploration and Production Nigeria Ltd (TEPNG)
  • Revamp of 1- Slot Well head Control Panel (IBEWA 83 UB 836) For Total Exploration and Production Nigeria Ltd (TEPNG)
  • Revamp of 9- Slots Well head Control Panel (IBEWA 83 UB 830) For Total Exploration and Production Nigeria Ltd (TEPNG)
  • National Pump 3 (NP3) Tubing/Liners Revamp (Ogbogu Flow Station) For Total Exploration and Production Nigeria Ltd (TEPNG)
  • Fusible loop installation for GE1 and GE2 at OLO flow station For Total Exploration and Production Nigeria Ltd.
  • Piping and Instrument (P & I) Drawing Design, Construction, Well Hook-Up and Commissioning of Spare Hydraulic Drawer for Ibewa 83-UB 830, 9- Slot well head control panel. For Total Exploration and Production Nigeria Ltd (TEPNG)
  • Removal and Re-installation of vessel’s instrument at Obite Gas Plant during 2012 OML 58 Shut down for Total Exploration and Production Nigeria Ltd (TEPNG)
  • Preparation of Bid Documents and Project Supervisions
ELECTRICAL AND INSTRUMENTATION ENGR
LIVING PROOF CONTROLS LTD
January 2007 - January 2010 (3 years 1 month)

2007–2010: Living Proof Controls Ltd

137 NTA Road, Mgbuoba Port Harcourt

Position: Electrical/ Instrumentation (E & I) Engineer:

Client: Total, EPCL and Walter Smith Marginal Oil Fields

Projects Executed:

  • National Pump 1 (NP1) Tubing/Liners Revamp(Ogbogu Flow Station) For Total Exploration and Production Nigeria Ltd (TEPNG)
  • Stripping, Stroking, On-line/Off-line Calibration and Testing of Control Valves during Turn around maintenance (TAM Projects) For Eleme Petrochemical Company Limited (EPCL)
  • Installation of 24V DC Uninterruptible Power Supply/Lighting at IRRI WHCP (IRRI CLUSTER) For Nigerian Agip Oil Company.
  • Fabrication of single recorder supports, Calibration of ITT Recorders and Valves for Walter Smith Marginal oil fields ltd.
  • Remedial Works on 4Bar/9Bar Compressors at Obagi Flow Station for Total Exploration and Production Nigeria (TEPNG)
  • Preparation of Bid Documents and Project Supervisions