Experience

Offshore Senior Instrumentation Technician
Prime-Atlantic Cegelec for Total FPSO DEEP WATER PROJECT- USAN, (OML 138 Offshore).
June 2012 - Present Day (4 years 10 months)

Organize and execute on-site maintenance jobs. Preventive maintenance on F&G Instruments such as : Inergen fire systems, water mist System, Gas Detectors – IR 7000 and Open Part Drager types, Flame detectors- smart eye, NTDs Oil mist smoke detectors. Clearing of invalidities daily especially for F&G packages. Operation & Maintenance of BDV’s, ROV’s, LCV’s, SDV’s and ESDV’s. General Valve maintenance and repairs in accordance to Philosophy of operations. Troubleshooting Process Instrumentation. Calibration and inspection of Process Instrumentation and Control Equipments. Pre-Commissioning, Commissioning of instruments on field. Read and Interpret Plans, Process Control Flow Diagrams, P&ID’s and ILD’s. Prepare Maintenance Service Reports / Calibration sheet. Verifying Instrument designs. Operation and monitoring of Distributed Control Systems (DCS) at the ITR. Transmitters Configuration, Calibration and general maintenance. General valve actuators maintenance: repair, stroking and calibration. Bench set of Control Valves. Ensure that Total HSE regulations are respected (especially procedures related to Work permits), as well as approved operating procedures for the job/task and standard industry practice during performance of maintenance operations placed under my responsibility. Carrying out interventions within my field of competence and identify recurrent corrective actions.

Instrumentation / Commissioning Technician
Prime-Atlantic Cegelec for Total / Saipem, (OML 58 Upgrade).
May 2011 - June 2012 (1 year 1 month)

ICSS installation and verification of hardware punch-lists. Connection and termination of cables for the DCS marshalling box. Loop check and test run DCS. Responsible for installing and managing the instrumentation on marshalling, DCS panels, analyzers and safety instrumented systems.(YOKOGAWA/TRICONEX). Calibration and inspection of Process Instrumentation and Control Equipment. Pre-Commissioning, Commissioning of instruments on field. Shut-down and Start-up of the Plant. Read and Interpret Plans, Process Control Flow Diagrams, P&ID’s and ILD’s. Prepare Maintenance Service Reports / Calibration sheet. Troubleshoot and Repair Analogue and Digital Controls. SAT and FAT procedure of the new DCS panels. Operation and monitoring of Distributed Control Systems (DCS).

R & M Technician (Equip)
Baker Hughes Inc
October 2010 - November 2010 (2 months)

Repair and maintenance of field equipments from operations.

Fix loops for appropriate calibrations.

Ensure maximum safety in all technical duties.

Technical Engineer.
CP Fibreglass Ltd.
November 2009 - August 2010 (10 months)

Installation of Fibreglass flooring/decking, composite panels on platforms and walkways, rail platforms / walkways, solid trench covers. Installation of glass-grid-reinforcement mesh on major/minor roads, airport-runways/pavement, parking-lots. Installation of delineators/utility markers on runways, parking-lots. Supervision of Site work. Reading and design of Installation diagrams. Supervision of company’s general projects. Technical presentations.

Project Instrumentation Technician. (I.T)
Vibroflotation and Geotechnical Nigeria Ltd.
May 2005 - April 2006 (1 year 1 month)

Calibration, Inspection of, Start up, Running and Shutdown of all Site Equipments, e.g. Transmitters, Gauges, Regulators, Compressors, Water pumps, and Turbo float. Troubleshooting and fault detection in electrical power & control circuits using electrical diagrams. Assist in organization of site activities. Recording of Operations on site. Electrical Maintenance and Repairs.

Company Technician.
CP Fibreglass Ltd.
August 2002 - April 2003 (9 months)

Installation of Fibreglass flagpoles, flooring/decking, composite panels on platforms and walkways, rail platforms / walkways, solid trench covers. Installation of delineators/utility markers on runways and parking-lots. Care for equipments and tools.