Back to CV list
Rowland
Personal data and contacts will be open only to employers with access to CV database
Transmission BO 450 000
Job Type: Full-Time , open to relocation

Education

From 0 to 2005
Ambrose Alli University, Ekpoma, Edo State
No added languages

Experience

Transmission BO
Ericsson Nigeria Limited
September 2010 - Present Day (6 years 8 months)
  • Implementation of Tellabs DXX cross connect
  • Clearing of alarms on DXX Equipment
  • Supervision and Acceptance of 6300, 8600 DXX NODE Installation.
  • Integration of new tellabs DXX nodes
  • 2G/3G capacity and upgrade planning
  • ATM creation for 3G mapping
  • Good understanding of ETEX CARD family on 6300 DXX NODE
  • Troubleshooting of Transmission link for both E1 and STM
  • Circuit provisioning
  • Installation, configuration and upgrade of ericsson microwave radio
  • Operations and maintenance of transmission node PDH,SDH
  • Operations and maintenance of SRT1F nokia-siemens SDH radio.
  • Transmission resource provisioning for MSC/BTS and BSC/BTS interface route upgrade and downgrade
  • Circuit provisioning, troubleshooting of enterprise circuit
  • Inter-connect/Expansion and clearing of faults in MSC, TSC, HLR, BSC, IN/VAS, International traffic.
  • Supervision/Coordination of Interconnect for International carriers including for but not limited to MTN, Glo, Visafone, Etisalat,
  • Supervision of Fibre cable laying, splicing and termination, Testing and Commissioning
  • Site survey for 3-G installation.
  • General knowledge of ericsson OPS and command handling
  • Weekly maintenance and report routine.
  • Provide guidance/support to transmission team in lagos and other regions based on management direction.

BSS/TRANSMISSION ENGR, TEAM LEAD
Linksoft Communication System
October 2009 - August 2010 (11 months)
  • Operation and maintenance of NOKIA FLEXI EDGE BTS, FLEXI HOPPER, FIU.
  • BSS alarm localisation and rectification.
  • Operation and maintenance of Access transmission links, including E1 resource provisioning
  • Commissioning of Nokia Flexi Equipment.
  • Maintenance of BTS site passive power equipment, Lister and Perkins generators
  • Making sure all accepted sites from customer are in specifications.
  • Taking of daily report.
  • Provide guidance to the team based on management direction.
  • Effective diesel delivery and consumption within assigned cluster
Transmission Engineer
Jonek Networks Limited
September 2007 - October 2009 (2 years 1 month)
  • Operations and maintenance of Zain PDH radio networks.
  • Transmission resource provisioning for MSC/BTS and BSC/BTS interface route upgrade and downgrade.
  • Localization and Rectification of cross–connect and Transmission path faults
  • Team participation in installation and commissioning of the following TX equipments Ericsson DXX, 6320, 6325, 6340, 6345, 6350, 6370