Resume Electrical Engineer. Resume in Nigeria.

Found 4605 resumes

Civil engineer
Outside Nigeria • 11 January 1953 (64 years ) • Experience: 29 years 7 months
April 2010 - April 2011
Civil Engineer, Quantity Surveyor
Responsibilities: As QS making Invoices, Bills of Quantities and Linear Schedules for labor, mechanization and construction works. Construction supervision for the construction of 3- and 4-storey residential buildings of reinforced Concrete monolit
Refreshed: 22 May
Graphic designer
Lagos • 29 May 1986 (30 years ) • Experience: 7 years 2 months
October 2013 - Present Day
Web Developer/ Social Media/ SEO Expert / Graphic Designer
Search Engine Optimization. Graphics Design. Web Site Maintenance. Website Design UI Development UX Development Portfolio:
Refreshed: 22 May
Electrical technician
Lagos • 6 January 1977 (40 years ) • Experience: 8 years 1 month
May 2009 - Present Day
electrical maintenance technician
in charge of all utilities.seeing to sound functioning and performance of all machineries
Refreshed: 11 May
Electrical engineer
Rivers • 14 December 1985 (31 years ) • Experience: 6 months
June 2011 - November 2011
industrial trainee
Use of information technology in monitoring oil and gas production facilities. Installation and maintenance of faulty equipment and faulty Remote terminal Unit (RTU) cards at flow station. Daily/weekly update of stock issued and received. And compila
Refreshed: 2 May
Electrical engineer
Lagos • 16 February 1984 (33 years ) • Experience: 9 years 3 months
December 2011 - Present Day
Network Engineer
Configuration and Installation of Network equipment (Radio Frequency, Router). Install, configure and maintain network components. Serve as technical specialist in network problems and emergencies. Troubleshoot and resolve network production problems
Refreshed: 27 April
Electrical Engineer
Lagos • 16 November 1973 (43 years ) • Experience: 15 years 4 months
December 2010 - February 2012
Electrical Engineer
Supervises the construction, installations of electrical equipments for 5000tpd cement line Strict supervision and implementation of LOTOTO procedure to all electrical activities. Daily/Weekly meetings with HOD and contractor discussing progress m
Refreshed: 27 April
Electrical engineering
Oyo • 14 May 1991 (26 years ) • Experience: 3 years 1 month
March 2016 - Present Day
Distribution Substation Operator
1. Controls equipment such as current converters, voltage transformers and circuit breakers that regulate flow of electricity through substation of electric power system and over distribution lines to consumers. Record reading of switch board instrum
Refreshed: 12 April
Electrical/Electronics Engineer
Osun • 2 April 1981 (36 years ) • Experience: 8 years 7 months
March 2014 - Present Day
Optic Fiber Quality Control Engineer
Supervision of relocation of Optic Fiber cable on Back Bone Lines Understanding and Installation of Earthling and grounding system Project coordinator and management in external line plant Monitor and Evaluate the performance of Network Equipment
Refreshed: 7 April
Electrical Engineer
Lagos • 16 July 1981 (35 years ) • Experience: 10 years 10 months
April 2013 - Present Day
MAINTENANCE TECHNICIAN
PROFESSIONAL COMPETENCY: Ability to design read and interpret electrical circuit diagrams. Ability to work on Pet machines Have understanding on Air and Water compressors (both HP & LP). Ability to work on Electrical panel of bottle Filler mach
Refreshed: 6 April
Engineering technician
Lagos • 31 December 1973 (43 years ) • Experience: 5 years 4 months
June 2014 - Present Day
ELECTRICAL TECHNICIAN
installation, repairs, maintenance, trouble shooting, plants,motors, rewinding matters relating to electrical issue
Refreshed: 15 March
Electronics and telecommunication
Lagos • 22 March 1983 (34 years ) • Experience: 2 years 4 months
July 2013 - June 2013
Teaching
NYSC
Refreshed: 15 March
Electrical technician/inspection/safety
Lagos • 31 December 1973 (43 years ) • Experience: 20 years 8 months
December 2011 - Present Day
ELECTRICAL TECHNICIAN/INSPECTION/SAFETY
Electrical team leader, responsible for electrical installation & integrity auditing. Diagnosing, inspection, testing, and commissioning. Responsible for the electrical assessment/ maintenance carried out on various project for TOTAL and other co
Refreshed: 15 March
Electrical technician
Lagos • 31 December 1973 (43 years ) • Experience: 5 years 4 months
December 2011 - Present Day
ELECTRICAL TECHNICIAN/INSPECTOR/SAFETY
Electrical team leader, responsible for electrical installation & integrity auditing. Diagnosing, inspection, testing, and commissioning. Responsible for the electrical assessment/ maintenance carried out on various project for TOTAL and other co
Refreshed: 15 March
Engineer
Rivers • 27 April 1981 (36 years ) • Experience: 7 years 7 months
September 2009 - Present Day
ELECTRICAL/INSTRUMENTATION ENGINEER
> Pre-commission and commissioning of 31 KM Street light, installation of 500/415KVA transformer (800A feeder pillar), 800KVA generator, transmission line testing, earthing and transformer testing. (Sept. 2009 – Dec, 2009) Duste, JigawaState. &g
Refreshed: 2 March
Electrical/electronics engineer
Rivers • 18 October 1987 (29 years ) • Experience: 4 years 6 months
September 2012 - Present Day
Electrical engineer
engages in computing and analysing bills of engineering measurements and evaluation, carrying both domestic and industrial installations of electrical appliances, maitenance and electrical trouble shooting.
Refreshed: 24 February