Resume Mechanical Engineer. Resume in Nigeria.

Found 2940 resumes

Mechanical technician
Rivers • 23 October 1982 (34 years ) • Experience: 12 years 2 months
April 2010 - Present Day
MECHANICAL TECHNICIAN
Carrying-out preparatory work in removal of LNG and Condensate loading arms Carrying-out maintenance activities at the loading jetty e.g. replacement of failed hoses; greasing activities of the LNG loading arm structural bearings and bearings & swi
Refreshed: 14 April
Mechanical
Rivers • 16 July 1990 (26 years ) • Experience: 6 years 11 months
March 2013 - Present Day
Self Employed
Selling of DPK
Refreshed: 22 March
Mechanical engineer
Rivers • 22 December 1987 (29 years ) • Experience: 6 months
June 2010 - November 2010
Field Engineer
Field Operations – Wireline logging / borehole seismic operation at Niger Delta Petroleum Resources (NDPR) rig. Modification and maintenance of Tough Logging Conditions System (TLCS) tools. Logging truck maintenance. Winch Drum Drive Skid (WDDS)
Refreshed: 16 March
Petrol mechanic
Lagos • 27 September 1987 (29 years ) • Experience: 7 years 2 months
June 2013 - Present Day
mechanic
@their maitanance department
Refreshed: 14 March
Mechanic
Lagos • 27 September 1987 (29 years ) • Experience: 7 years 2 months
June 2013 - Present Day
mechanic
@their maitanance department
Refreshed: 14 March
Mechanical engineer
Rivers • 8 May 1971 (45 years ) • Experience: 26 years
January 2012 - Present Day
Mechanical Enginner
1. Planning, co-ordination and execution of maintenance of mechanical equipment. 2. Service and maintenance of pneumatic and hydraulic components: cylinders, valves, analyses breakdown and carryout corrective /preventive action of faults in hydrauli
Refreshed: 16 February
Production operation technician
Rivers • 8 May 1971 (45 years ) • Experience: 26 years
January 2012 - Present Day
Mechanical Enginner
· Planning, co-ordination and execution of maintenance of mechanical equipment. · Service and maintenance of pneumatic and hydraulic components: cylinders, valves, analyses breakdown and carryout corrective /preventive action of faults in hydraulic
Refreshed: 16 February
Mechanical service engineer
Rivers • 8 May 1971 (45 years ) • Experience: 26 years
January 2012 - Present Day
Senoir Mechanical Engineer
Responsibilities: Maintain mechanical equipment for our clients' companies and servicing of hydraulic/pneumatic systems for Global Scanning System Limited AT Warri, Lagos, Calabar and Seme Border as well as S.G.S Ltd, Onne Port Harcourt. Achie
Refreshed: 16 February
Mechanical technician, hydro tester.
Rivers • 3 November 1980 (36 years ) • Experience: 10 years 11 months
January 2009 - October 2010
Mechanical Technician
• Mechanical Technician • Bolt Tensioning • Air Blowing of pipes Flange Alignment • Changing of Gaskets
Refreshed: 5 February
Graduate trainee
Abuja • 15 August 1982 (34 years ) • Experience: 8 years 11 months
April 2008 - Present Day
Mechanical Engineer
• Making comprehensive inspection of equipments (Wheel Loader, Excavator, Roller, Forklift, Generator, Bulldozer, Crane, Road Finisher etc) and vehicle/Trucks whether it conforms to specification and recording full details. • Maintenance/Servicing of
Refreshed: 3 February
Welder fabricator
Lagos • 18 January 1975 (42 years ) • Experience: 11 years 7 months
May 2003 - November 2014
Mechanical Teachnician
am in charge of repair maintanance ot ourmachine
Refreshed: 29 January
Mechanical
Rivers • 3 April 1983 (34 years ) • No experience
Refreshed: 15 January
Civil engineer
Outside Nigeria • 11 January 1953 (64 years ) • Experience: 29 years 7 months
April 2010 - April 2011
Civil Engineer, Quantity Surveyor
Responsibilities: As QS making Invoices, Bills of Quantities and Linear Schedules for labor, mechanization and construction works. Construction supervision for the construction of 3- and 4-storey residential buildings of reinforced Concrete monolit
Refreshed: 17 December 2016
Mechanical engineering
Kano • 25 June 1982 (34 years ) • Experience: 7 years 8 months
August 2014 - Present Day
Production Manager
planning, controling and implementation of production process in accordance to standard. also coordinate the schedule of maintenance of all the machine in the factory in case of breakdown/routine check or periodic maintenance. Carry out the installat
Refreshed: 30 November 2016
Mechanical engineer
Outside Nigeria • 1 July 1970 (46 years ) • Experience: 7 years
September 2011 - September 2012
AGM (Projects)
¨ Skillfully arranging General arrangement of drawings for new project during the time of quotation while lucratively modifying Final layout drawings (2D/3D), Foundation drawings before time of Installation ¨ Adroitly recommending fo
Refreshed: 23 November 2016