Resume Production Engineer. Resume in Nigeria.

Found 7141 resumes

Electrical installation AND maintenance engineer
Rivers • 7 July 1976 (40 years ) • Experience: 14 years 7 months
October 2012 - Present Day
ELECTRICAL INSTALLATION AND MAINTENANCE ENGINEER
I. Organizes work schedule and supervises the work of Electrical/Mechanical Personnel II. Supervises Electricians, Plumbers & A/C technicians in carrying out the Installation and Maintenance of Electro-Mechanical Systems and devices. III. Supervi
Refreshed: 19 January
Electrical engineering
Lagos • 24 November 1984 (32 years ) • Experience: 5 years 3 months
August 2013 - Present Day
electrican
Electrical installation and repair, faulted line tracing Generator servicing
Refreshed: 12 January
Engineering Technician
Lagos • 12 February 1982 (34 years ) • Experience: 10 years 9 months
April 2011 - Present Day
Workshop Supervisor
Coordinating all technical jobs relating to internal combustion engines and mechanical equipments.
Refreshed: 10 January
Electrical Engineer
Abuja • 12 March 1982 (34 years ) • Experience: 7 years 10 months
January 2016 - Present Day
Metering Engineer
Metering Engineer: Energy meter installation (Maximum Demand and Non- Maximum Demand), testing, commissioning and after installation maintenance service, certification and recertification of installed meters, fault resolution on prepayment meter to r
Refreshed: 28 December 2016
Civil engineer
Outside Nigeria • 11 January 1953 (64 years ) • Experience: 29 years 7 months
April 2010 - April 2011
Civil Engineer, Quantity Surveyor
Responsibilities: As QS making Invoices, Bills of Quantities and Linear Schedules for labor, mechanization and construction works. Construction supervision for the construction of 3- and 4-storey residential buildings of reinforced Concrete monolit
Refreshed: 17 December 2016
Engineer
Lagos • 2 October 1985 (31 years ) • Experience: 2 years 2 months
April 2016 - Present Day
Technical Support Engineer (Commissioning Engineer)
Installation and commissioning of Control Panels. Project costing. Trouble shooting of different types of electrical panel. Commissioning of electrical panel such as Auto mains failure, Auto transfer switch, Synchronous panel. Programming of generato
Refreshed: 15 December 2016
Civil Engineer
Lagos • 11 February 1986 (30 years ) • Experience: 4 years 10 months
July 2014 - Present Day
Site Engineer
Coordination of both human and material resources towards successful completion of projects. Attending weekly site progress meeting on behalf of my employer. Ensuring that all construction is carried out in observance to engineering specifications.
Refreshed: 7 December 2016
Engineer
Lagos • 25 April 1989 (27 years ) • Experience: 1 year 10 months
December 2013 - January 2015
Maintenance Engineer
Maintenance of all broadcasting and electrical equipment / installation. Operations of 10kw TV transmitter and 20kw radio transmitter (eddystone) operations of 250KVA Mikano generator and 350 CAT generator.
Refreshed: 2 December 2016
Graduate trainee
Lagos • 9 March 1985 (31 years ) • Experience: 4 years 5 months
February 2009 - June 2011
Electrical Engineer
Responsible for testing instruction ,equipment in the building installation detainls and preparation of materials list (2) installing maintaining building appliance. (3) provided oversight in the assembling, installation , testing and maintenance of
Refreshed: 1 December 2016
Mechanical engineering
Kano • 25 June 1982 (34 years ) • Experience: 7 years 6 months
August 2014 - Present Day
Production Manager
planning, controling and implementation of production process in accordance to standard. also coordinate the schedule of maintenance of all the machine in the factory in case of breakdown/routine check or periodic maintenance. Carry out the installat
Refreshed: 30 November 2016
Database administrator/implementation
Lagos • 31 July 1985 (31 years ) • Experience: 5 years
April 2014 - Present Day
Database Administrator/Business Intelligent
Intsallation of Microsoft SQL Server 2012R2 Database Administrator (Sql server 2012) Data Extraction using SSIS Data Implementation on Fintrak Corebanking Application Data Mining using SSAS Microsoft Sharepoint dashboard designing (Power view)/Excel
Refreshed: 28 November 2016
Production Manager
Benue • 23 June 1988 (28 years ) • Experience: 4 years 3 months
April 2012 - May 2013
Executive Marketer
Marketing
Refreshed: 27 November 2016
Engineering
Lagos • 2 May 1986 (30 years ) • Experience: 4 years
December 2014 - July 2016
Field Operation Manager
Provide Electrical Support, preventive Electrical Maintenance, Ability to troubleshoot, Managing of staff and company equipment, Electrical Installation and repair, ATS/Hybrid instalation and repair,
Refreshed: 24 November 2016
Maintanace
Lagos • 2 January 1987 (30 years ) • Experience: 7 years 3 months
September 2006 - November 2013
Mentainace Engineer
To Ensure that all the machines are in good working condition,Site plant was in my care to minimise Downtime (One year Industria Training and temperary staff during holiday) Service Year with Brass Engineering and Construction Company (Plant section
Refreshed: 18 November 2016
Welding
Lagos • 14 February 1979 (37 years ) • Experience: 5 years 5 months
July 2011 - Present Day
Structural Engineer
SUMMARY OF EXPERIENCE: 4 years working experience in civil/structural engineering. A Certified International Welding Engineer (IWE). Have a good knowledge of materials and their weldability (ferrous and non-ferrous) Have a knowledge of Writing pre W
Refreshed: 16 November 2016