Resume QA/QC. Resume in Nigeria.

Found 570 resumes

Cswip 3.1 QA/QC engineer
Lagos • 28 June 1974 (42 years ) • Experience: 6 years 1 month
April 2007 - April 2013
QA/QC WELDING INSPECTOR
Responsibilities: I visually inspected fusion welded joint before, during and after welding activities. I carry out and monitor ( NDT ) activities like ( DPI ), ( MPI ), ( UT ), & ( RFI ). I perform the inspection of project materials received for
Refreshed: Today
Construction supervisor
Rivers • 3 May 1969 (47 years ) • Experience: 5 years
March 2012 - Present Day
QA/QC LEAD ENGINEER
RESPONSIBILITIES:  Coordination of Inspection activities.  Material Inspection of the plates and pipes with respect to the packing list and purchase order.  Review of MTC to confirm material specification correspondence with the material suppl
Refreshed: 7 February
Electrical/instrument inspector
Rivers • 1 August 1984 (32 years ) • Experience: 6 years 9 months
June 2010 - Present Day
QA/QC ENGINEER
Carry out inspection and test plan (I T P) on all activities on site, Inspect and document every work related document. Monitor and inspect all sub-contractors activities on site. Other site activities as advised by site management.
Refreshed: 15 November 2016
Qa/qc engineer
Rivers • 27 November 1981 (35 years ) • Experience: 9 years 6 months
May 2010 - Present Day
Qa/Qc scientist
sampling, analysis, calibrations, bulk reagent,
Refreshed: 9 September 2016
QA/QC
Anambra • 21 May 1985 (31 years ) • Experience: 3 years 10 months
June 2013 - Present Day
QA/QC
*Responsible for performing the required quality control inspections on welds and complete the associated inspection documentation at site (onshore & offshore).*Making sure that the hydrogen electrode used is properly baked and maintained at the
Refreshed: 16 August 2016
QA/QC engineer
Delta • 17 June 1977 (39 years ) • Experience: 10 years 2 months
February 2007 - Present Day
project supervisor/certified welding inspector
Knowledge and Skills : (1) preparation of reports (2) effective oral and written communication (3) good understanding of the fundamentals of SMAW, SAW, OFW, RW, GTAW, FCAW, GMAW, PAW, SW, ESW and thermal spraying, soldering, mechanical cutting, Therm
Refreshed: 8 August 2016
QA/QC Engineer
Rivers • 28 September 1981 (35 years ) • Experience: 10 years 2 months
February 2012 - Present Day
Process Engineer
Planning and arrangement of day-to-day activities. Fabrication,welding and laying of 150mm and 250mm carbon steel pipe Laying of 110mm and 160mm Upvc distribution pipe Installation of all different sizes of valves Installation of different flow meter
Refreshed: 21 April 2016
Project Engineer
Rivers • 28 September 1981 (35 years ) • Experience: 8 years 9 months
July 2013 - July 2014
Project Engineer
Planning and arrangement of day-to-day activities Fabrication,welding and laying of 150mm and 250mm carbon steel pipe Laying of 110mm and 160mm Upvc distribution pipe Installation of all different sizes of valves Installation of different flow meters
Refreshed: 21 April 2016
Project coordinator
Rivers • 21 March 1980 (37 years ) • Experience: 9 years 8 months
October 2011 - Present Day
QA/QC Engineer Document Control
Ensure all activities related to the proper control of Company or Client document, including technical documents, procedures, drawings etc are carried out according to the Document Control Procedure. Input document data into the standard registers en
Refreshed: 4 April 2016
QA/QC Сoordinator
Rivers • 21 March 1980 (37 years ) • Experience: 9 years 7 months
October 2011 - Present Day
QA/QC Engineer Document Control
Ensure all activities related to the proper control of Company or Client document, including technical documents, procedures, drawings etc are carried out according to the Document Control Procedure. Input document data into the standard registers en
Refreshed: 4 April 2016
QC/QA JOB
Lagos • 11 May 1975 (41 years ) • Experience: 10 years 5 months
September 2006 - Present Day
Quality Assurance/Quality Control Officer
- Sampling and physical / chemical analysis of raw materials, water, intermediates and finished products - Ensuring Good Laboratory Practices (G
Refreshed: 8 December 2015
Assistant QA/HSE manager
Lagos • 1 September 1971 (45 years ) • Experience: 12 years 10 months
August 2015 - Present Day
Compliance Manager
GMP enforcement to ensure compliance to quality standard Ensure the use of SOP in the production processes. Ensure daily pep talk on GMP staff compliance. Assist in In-Process unit supervision and ref samples co- ordination.
Refreshed: 21 September 2015
QA/QC Co-ordinator
Rivers • 11 May 1974 (42 years ) • Experience: 16 years 3 months
October 2013 - Present Day
Quality Co-ordinator
Coordinate the implementation of Quality Management System activities (e.g. Verification, final control, metrology, local documents, event management, inspection & testing as applicable). Ensures Quality specifications are duly met and provides t
Refreshed: 1 July 2015
QA/QC manager
Rivers • 17 May 1958 (58 years ) • Experience: 32 years 1 month
January 1982 - January 2014
QA/QC manager
A Very well Qualified and Experienced QA/QC Proffesional
Refreshed: 9 May 2015
QC mechanical
Rivers • 28 March 1960 (56 years ) • No experience
Refreshed: 4 May 2015