Resume Structural Engineer. Resume in Nigeria.

Found 12470 resumes

Electrical Engineer
Lagos • 2 June 1982 (35 years ) • Experience: 9 years 8 months
September 2008 - October 2014
Electrical Technician
lnstallation and maintenance of ATS & AMF panel,major grade to electrical control/electronic circuit operation equipment,responsible for preventive maintenance on Electrical device and safety procedures to Electrical control system,Troubleshootin
Refreshed: Today
Electrical engineering
Abuja • 9 April 1988 (29 years ) • Experience: 7 years 8 months
January 2013 - Present Day
bar man
service of drinks to waiter and customers
Refreshed: 24 July
Mechanical engineer
Lagos • 22 January 1978 (39 years ) • Experience: 8 years
January 2014 - August 2014
PDMS ENGINEER (Entry Level)
Designed and modelled plant equipment and piping system as per client specifications while utilising mechanical data sheet and PI&Ds.  Developed piping general arrangement
Refreshed: 24 July
Electrician
Lagos • 25 October 1986 (30 years ) • Experience: 7 years 11 months
January 2014 - Present Day
Electrical maintenance
Analysis design of circuit,trouble shooting,use of Electrical and mechanical equipments,callibration of machines,use of automated machines.
Refreshed: 21 July
Engineering and academia
Lagos • 27 March 1987 (30 years ) • Experience: 1 year 7 months
July 2012 - June 2013
Monotoring team
monitoring of oil spillage Enumeration and documentation of oil wells.
Refreshed: 21 July
Construction/telecommunication
Oyo • 26 May 1986 (31 years ) • Experience: 5 years 7 months
January 2011 - October 2013
Construction/Telecommunication
Engineer/Facility Manager
Refreshed: 16 July
Electrical electronics engineering/telecommunication
Oyo • 26 May 1986 (31 years ) • Experience: 8 years 3 months
March 2015 -
Operating-Supporting Engineer
Coordinating and operating systems for smooth service delivery.
Refreshed: 16 July
Civil engineer
Ogun • 12 November 1982 (34 years ) • Experience: 2 years 2 months
November 2016 - February 2017
Installation of baby care (DIAPERS) production machines (LINE 1, 2, 3) Procter and Gamble Projects
Position held: HS&E coordinator Responsibility: • Preparing method statement and risk assessment • Making report on daily progress of work • Weekly tool box talk • Daily pre-task briefing • Hazard
Refreshed: 3 July
Head of youth segment
Lagos • 11 November 1990 (26 years ) • Experience: 6 years 11 months
January 2013 - March 2011
Subject Teacher
Basic technology Teacher.
Refreshed: 29 June
Engineer
Rivers • 28 July 1982 (35 years ) • Experience: 3 years 3 months
September 2016 - May 2017
Lecturer
Lecturing the following courses: 1. System Assembly and Upgrade 2. Operating System I 3. System Architecture.
Refreshed: 25 June
Mechanical engineer
Lagos • 5 October 1983 (33 years ) • Experience: 9 years 11 months
August 2015 - Present Day
Project Engineer Mechanical Services
Saddle with the responsibilities of Mechanical Services to buildings, from design to implementation of design plans and ensuring that job done comply with material specs, regulation and standard code of practice
Refreshed: 22 June
Electrical Engineer
Lagos • 19 August 1987 (29 years ) • Experience: 8 years 1 month
November 2015 - Present Day
Electrical Engineer
maintenance of receiving card,power module, led module, hubs,DC cable,graphics card
Refreshed: 15 June
Civil engineer
Lagos • 24 March 1980 (37 years ) • Experience: 6 years 7 months
November 2011 - October 2013
ENGINEER
Job Description Structural Design and Detailing Construction management Multi-Storey Building construction supervision Construction management and supervision Project performance reporting Project monitoring and control Preparation and review of cont
Refreshed: 14 June
Project Manager
Abuja • 21 February 1971 (46 years ) • Experience: 26 years 9 months
April 2010 - Present Day
Project manager
1. In charge of the project budget for materials and man power and maintaining accurate billing records 2. Obtaining all necessary permits and licenses. 3. Daily management of up to fifteen (15) staff and multiple Sub-Contractors 4. Ensuring that all
Refreshed: 14 June
Electrical Engineer
Rivers • 10 December 1985 (31 years ) • Experience: 4 years 2 months
June 2016 - Present Day
Field Electrical Engineer
General inspection of proposed site. Prepare detailed sketches of rout survey for the proposed site. Prepare bill of quantity. Carry out mapping and pegging of proposed site. Liaise with clients where necessary. Assign daily duties to subordinates.
Refreshed: 14 June