Resume Structural Engineer. Resume in Nigeria.

Found 12499 resumes

Electrical engineer
Lagos • 16 February 1984 (33 years ) • Experience: 9 years 3 months
December 2011 - Present Day
Network Engineer
Configuration and Installation of Network equipment (Radio Frequency, Router). Install, configure and maintain network components. Serve as technical specialist in network problems and emergencies. Troubleshoot and resolve network production problems
Refreshed: Today
Field engineer
Rivers • 13 September 1980 (36 years ) • Experience: 6 years 6 months
June 2015 - February 2016
grinder/fitter mate
Interpretation of engineering piping drawing (spool & isometric). Full knowledge of pipe fittings & procedures. Cleaning, cutting, grinding, beveling& proper preparation of pipes for welding. Fits-up pipes of different sizes & ensur
Refreshed: Yesterday
Project engineer
Rivers • 27 March 1982 (35 years ) • Experience: 2 years 1 month
August 2009 - August 2011
project engineer
Main responsibilities; Plan and supervise delivery of Pipe-rack foundations of different types and sizes using concrete pile (CFA) and Micro Pile (MP) deep foundation type, pipe support, Fire water tank foundation, Flare tower foundation, intern
Refreshed: 24 April
Engineer
Kogi • 6 March 1986 (31 years ) • Experience: 3 years 8 months
September 2013 - Present Day
Main Control Board (MCB)
power generation and distribution.
Refreshed: 24 April
Engineer
Lagos • 1 September 1985 (31 years ) • Experience: 5 months
February 2013 - June 2013
Supervisor
I supervises staff and refuse evacuation operations.
Refreshed: 21 April
Engineer
Lagos • 1 September 1985 (31 years ) • Experience: 2 years 6 months
January 2014 - January 2016
Teacher
Teacher of chemistry and basic science
Refreshed: 21 April
Engineering and academia
Lagos • 27 March 1987 (30 years ) • Experience: 1 year 7 months
July 2012 - June 2013
Monotoring team
monitoring of oil spillage Enumeration and documentation of oil wells.
Refreshed: 11 April
Electrical/Electronics Engineer
Osun • 2 April 1981 (36 years ) • Experience: 8 years 7 months
March 2014 - Present Day
Optic Fiber Quality Control Engineer
Supervision of relocation of Optic Fiber cable on Back Bone Lines Understanding and Installation of Earthling and grounding system Project coordinator and management in external line plant Monitor and Evaluate the performance of Network Equipment
Refreshed: 7 April
Engineer
Lagos • 6 June 1986 (30 years ) • Experience: 11 months
August 2012 - June 2013
SITE ENGINEER
To supervise government on going project awarded to construction company, to make sure that rigth things are done and report back to cheif engineer.
Refreshed: 30 March
Engineer
Oyo • 10 December 1988 (28 years ) • Experience: 3 years 2 months
January 2006 - February 2009
Computer Instructor
Application of system analysis techniques and procedures including consulting with users to determine hardware/software or system functional specifications. Meet every class session promptly and ready for that sessions instruction. Coordination and i
Refreshed: 28 March
Subsea engineer
Rivers • 27 May 1978 (38 years ) • Experience: 8 years 8 months
August 2008 - Present Day
Field Engineer
Control or operates chemical processes or systems of machines via panel board, control boards, or semi-automatic equipment. Regulate or shutdown equipment during emergency situation as directed
Refreshed: 28 March
Engineering technician
Lagos • 22 October 1988 (28 years ) • Experience: 5 years
August 2015 - Present Day
Project manager/ Installation and maintenance engineer
CDMA BTS 3606, 3606E and 3606C Hardware installation, operation and maintenance G29 & 100G21),Huawei (Hybrid System) GSM BTS 3012, 3900, 3900AE, WIMAX BBU 3900, RBS 2206, 2207, 2216 Hardware and Software commissioning of huawei Optix RTN 950 Tran
Refreshed: 22 March
Engineer
Abuja • 13 February 1982 (35 years ) • Experience: 6 years 6 months
May 2014 - Present Day
Technical operator
3 years shop floor operational experience of the Krones KR96538 Variopac machine and K10896"Labeler machine,. Application of KAIZEN principles in daily work minimizing downtime
Refreshed: 20 March
Petroleum engineer
Rivers • 22 December 1987 (29 years ) • Experience: 6 months
June 2010 - November 2010
Field Engineer
Field Operations – Wireline logging / borehole seismic operation at Niger Delta Petroleum Resources (NDPR) rig. Modification and maintenance of Tough Logging Conditions System (TLCS) tools. Logging truck maintenance. Winch Drum Drive Skid (WDDS)
Refreshed: 16 March
Mechanical engineer
Rivers • 22 December 1987 (29 years ) • Experience: 6 months
June 2010 - November 2010
Field Engineer
Field Operations – Wireline logging / borehole seismic operation at Niger Delta Petroleum Resources (NDPR) rig. Modification and maintenance of Tough Logging Conditions System (TLCS) tools. Logging truck maintenance. Winch Drum Drive Skid (WDDS)
Refreshed: 16 March