Resume System Engineer. Resume in Nigeria.

Found 12336 resumes

Engineer
Oyo • 10 December 1988 (28 years ) • Experience: 3 years 2 months
January 2006 - February 2009
Computer Instructor
Application of system analysis techniques and procedures including consulting with users to determine hardware/software or system functional specifications. Meet every class session promptly and ready for that sessions instruction. Coordination and i
Refreshed: Yesterday
Subsea engineer
Rivers • 27 May 1978 (38 years ) • Experience: 8 years 8 months
August 2008 - Present Day
Field Engineer
Control or operates chemical processes or systems of machines via panel board, control boards, or semi-automatic equipment. Regulate or shutdown equipment during emergency situation as directed
Refreshed: Yesterday
Cswip 3.1 QA/QC engineer
Lagos • 28 June 1974 (42 years ) • Experience: 6 years 1 month
April 2007 - April 2013
QA/QC WELDING INSPECTOR
Responsibilities: I visually inspected fusion welded joint before, during and after welding activities. I carry out and monitor ( NDT ) activities like ( DPI ), ( MPI ), ( UT ), & ( RFI ). I perform the inspection of project materials received for
Refreshed: 27 March
Engineering technician
Lagos • 22 October 1988 (28 years ) • Experience: 5 years
August 2015 - Present Day
Project manager/ Installation and maintenance engineer
CDMA BTS 3606, 3606E and 3606C Hardware installation, operation and maintenance G29 & 100G21),Huawei (Hybrid System) GSM BTS 3012, 3900, 3900AE, WIMAX BBU 3900, RBS 2206, 2207, 2216 Hardware and Software commissioning of huawei Optix RTN 950 Tran
Refreshed: 22 March
Field engineer
Rivers • 13 September 1980 (36 years ) • Experience: 6 years 5 months
June 2015 - February 2016
grinder/fitter mate
Interpretation of engineering piping drawing (spool & isometric). Full knowledge of pipe fittings & procedures. Cleaning, cutting, grinding, beveling& proper preparation of pipes for welding. Fits-up pipes of different sizes & ensur
Refreshed: 20 March
Engineer
Abuja • 13 February 1982 (35 years ) • Experience: 6 years 6 months
May 2014 - Present Day
Technical operator
3 years shop floor operational experience of the Krones KR96538 Variopac machine and K10896"Labeler machine,. Application of KAIZEN principles in daily work minimizing downtime
Refreshed: 20 March
Petroleum engineer
Rivers • 22 December 1987 (29 years ) • Experience: 6 months
June 2010 - November 2010
Field Engineer
Field Operations – Wireline logging / borehole seismic operation at Niger Delta Petroleum Resources (NDPR) rig. Modification and maintenance of Tough Logging Conditions System (TLCS) tools. Logging truck maintenance. Winch Drum Drive Skid (WDDS)
Refreshed: 16 March
Mechanical engineer
Rivers • 22 December 1987 (29 years ) • Experience: 6 months
June 2010 - November 2010
Field Engineer
Field Operations – Wireline logging / borehole seismic operation at Niger Delta Petroleum Resources (NDPR) rig. Modification and maintenance of Tough Logging Conditions System (TLCS) tools. Logging truck maintenance. Winch Drum Drive Skid (WDDS)
Refreshed: 16 March
Drilling engineer
Rivers • 22 December 1987 (29 years ) • Experience: 6 months
June 2010 - November 2010
Field Engineer
Field Operations – Wireline logging / borehole seismic operation at Niger Delta Petroleum Resources (NDPR) rig. Modification and maintenance of Tough Logging Conditions System (TLCS) tools. Logging truck maintenance. Winch Drum Drive Skid (WDDS)
Refreshed: 16 March
Electronics and telecommunication
Lagos • 22 March 1983 (34 years ) • Experience: 2 years 4 months
July 2013 - June 2013
Teaching
NYSC
Refreshed: 15 March
Engineer
Rivers • 27 April 1981 (35 years ) • Experience: 7 years 7 months
September 2009 - Present Day
ELECTRICAL/INSTRUMENTATION ENGINEER
> Pre-commission and commissioning of 31 KM Street light, installation of 500/415KVA transformer (800A feeder pillar), 800KVA generator, transmission line testing, earthing and transformer testing. (Sept. 2009 – Dec, 2009) Duste, JigawaState. &g
Refreshed: 2 March
Engineering
Rivers • 20 October 1983 (33 years ) • Experience: 3 years 6 months
October 2012 - April 2014
site engineer / supervisor
Bayelsa State city project (CCTV) Installation of mast project (ETISALAT) To impose all workers to use their personal protective equipment [PPE] to where it suppose to be used. To make sure that the good materials are used at the right place. To mak
Refreshed: 1 March
Engineer
Lagos • 19 October 1982 (34 years ) • Experience: 4 years 8 months
February 2015 - April 2015
Marketer
Training and educating people of Banks, Schools, and Market area about the products. I.e, Fonio, Natual Honey and pure cocoa breverages.
Refreshed: 28 February
Database administrator/implementation
Lagos • 31 July 1985 (31 years ) • Experience: 5 years 3 months
April 2014 - Present Day
Database Administrator/Business Intelligent
Intsallation of Microsoft SQL Server 2012R2 Database Administrator (Sql server 2012) Data Extraction using SSIS Data Implementation on Fintrak Corebanking Application Data Mining using SSAS Microsoft Sharepoint dashboard designing (Power view)/Excel
Refreshed: 25 February
Electrical/electronics engineer
Rivers • 18 October 1987 (29 years ) • Experience: 4 years 6 months
September 2012 - Present Day
Electrical engineer
engages in computing and analysing bills of engineering measurements and evaluation, carrying both domestic and industrial installations of electrical appliances, maitenance and electrical trouble shooting.
Refreshed: 24 February