Resume Tester. Resume in Nigeria.

Found 59 resumes

Mechanical technician, hydro tester.
Rivers • 3 November 1980 (36 years ) • Experience: 10 years 11 months
January 2009 - October 2010
Mechanical Technician
• Mechanical Technician • Bolt Tensioning • Air Blowing of pipes Flange Alignment • Changing of Gaskets
Refreshed: 5 February
Electrical technician
Lagos • 23 September 1984 (32 years ) • Experience: 6 years 4 months
November 2010 - Present Day
Electrical engineering
Production and maintenance, electrical wiring and services
Refreshed: 18 January 2016
Hydrographic Surveyor Geologist
Rivers • 1 June 1981 (35 years ) • Experience: 9 years 1 month
March 2014 - April 2014
Online Surveyor
DGPS and Gyro Verification Transit fix on four legged platform Calibration of echo-sounder & sidescan sonar Interfacing single beam dual frequency echo-sounder to navigation system(eiva-navipac). Outputting position to sidecan sonar & magneto
Refreshed: 24 September 2014
Customer care representative and product developer and tester
Lagos • 8 September 1986 (30 years ) • Experience: 5 years 5 months
July 2011 - Present Day
Customer Care Representative
Customer Care Service
Refreshed: 13 October 2015
Well test
Rivers • 24 January 1988 (29 years ) • Experience: 6 years 6 months
August 2010 - Present Day
Well test
Rig up and rig down of well test pipes, elbows & Crossovers to connect surface well test equipment. Operating and Servicing of surface well testing equipment such as choke manifold, sand filter, Burner booms, surge & gauge tank, oil & gas
Refreshed: 30 April 2015
Electrical engineer
Abuja • 4 April 1987 (29 years ) • Experience: 7 years 8 months
March 2013 - Present Day
computer engineer
Repair of computer formatting of computer networking and troubleshooting of computer operations of biometric machines operation of visitor management system
Refreshed: 5 February 2015
Drilling
Rivers • 27 January 1985 (32 years ) • Experience: 2 years 10 months
April 2014 - Present Day
hydrojetting.Umbilical swap re commissioning. hydrojetting.pressure testing
Hydrotesting.pressure testing.hydrojetting.Umbilical Swap.
Refreshed: 29 November 2014
Geologist
Lagos • 2 November 1988 (28 years ) • Experience: 3 months
October 2012 - December 2012
Inspection & Testing unitt
My work was to inspect thee plant refinery, tanks, boiler and Carbon Black to check if the tanks are neat for storage of petrochemicals like fuel, kerosene, propylene e.t.c. To inspect for corrosion&rusting. And to pressure test the pipe and some
Refreshed: 28 November 2014
Construction engineer
Delta • 7 January 1981 (36 years ) • Experience: 6 years 5 months
October 2014 - Present Day
Rehabilitation of Foam Pourers and Water Sprinklers & Install Header Valves for WRPC
I WORKED AS PROJECT ENGINER: Schedule preparation, pre-planning and resource forecasting for engineering and other technical activities relating to the project.
Refreshed: 24 November 2014
Geologists
Ekiti • 15 July 1981 (35 years ) • Experience: 1 year
July 2006 - June 2007
soil testing
Research on solid minerals and soil testing.
Refreshed: 22 November 2014
RF planning and optimization senior engineer
Rivers • 6 November 1978 (38 years ) • Experience: 4 years 7 months
September 2012 - July 2013
RF Planning and Optimization Engineer
. RF Detailed Design and Configuration of Sites in Asset Planning Tool . Produce Traffic Analysis . Use of Asset Planning Tool for Site Database Management . Carrying out of Site Survey and Selection . Carrying out of Technical Site Survey . Initiate
Refreshed: 19 November 2014
Lab job
Lagos • 10 February 1989 (28 years ) • Experience: 7 months
May 2012 - November 2012
Testing the quality of flour.
I worked in lab with different machines tasting for qualities of flour, I also worked in the mills.
Refreshed: 18 November 2014
Oil and gas
Rivers • 29 March 1985 (31 years ) • Experience: 1 year 1 month
March 2008 - March 2009
well test trainee
Worked as a well tester
Refreshed: 6 November 2014
Counselling
Kwara • 5 September 1987 (29 years ) • Experience: 4 years 1 month
November 2012 - Present Day
Counselling,testing,data entry and documentation
Pre-test counselling of patients,testing of patients for their status,post-test counselling and follow up of patients,care&support,abtraction of patients folder for update,enroll patients into care,entry of patients data\documentation,other offic
Refreshed: 29 October 2014
Well testing
Rivers • 12 May 1984 (32 years ) • Experience: 5 years 7 months
June 2008 - December 2013
WELL TEST
WELL TEST SUPERVISOR
Refreshed: 28 October 2014