Resume Woodworker. Resume in Nigeria.

Found 0 resumes

There is no information at your request
Try to use another keyword

Look at popular resumes:

Programmer
Lagos • 3 September 1977 (39 years ) • Experience: 6 years 11 months
October 2014 - Present Day
Systems Analyst
Portal and CBT software and management
Refreshed: Today
Engineer
Lagos • 9 August 1986 (30 years ) • Experience: 4 years 1 month
March 2016 - Present Day
Power Auditor
Auditing of job done on telecoms sites by vendors on Solar, AC and DC Generators, Batteries, Hybrid systems, Synchronizations and Remote Monitoring Systems on power solutions. Checking for power Availability and making sure no power outage on site fo
Refreshed: Today
Hotel Operations / Duty Manager
Abuja • 25 May 1963 (53 years ) • Experience: 20 years 1 month
February 2006 - January 2016
Duty Manager(Assistant General Manager, Afternoon Shift)
Coordinated General Operations of the hotel during the afternoon shift 2008 to 2016
Refreshed: Today
Medical Officer
Edo • 6 September 1993 (23 years ) • Experience: 1 year 6 months
June 2016 - February 2017
Biology teacher
I helped student to acquire an accurate knowledge of the subject matter
Refreshed: Today
Medical Physiologist
Edo • 6 September 1993 (23 years ) • Experience: 1 year 6 months
June 2016 - February 2017
Biology teacher
I helped student to acquire an accurate knowledge of the subject matter
Refreshed: Today
Registered nurse midwife
Lagos • 30 June 1984 (32 years ) • Experience: 5 years 10 months
September 2013 - August 2016
Nursing officer
Nursing care of the patient in the ward
Refreshed: Today
Refrigeration /HVAC s technican
Rivers • 13 September 1980 (36 years ) • Experience: 4 years 11 months
June 2015 - February 2016
Grinder/fittermate
Interpretation of engineering piping drawing,full knowledge of pipe fittings and procedures,installation of spools,flanges and elbows.entering of faulty equipment, preparation of report on operational matters,adequate housekeeping & established H
Refreshed: Today
Graduate trainee
Lagos • 5 November 1993 (23 years ) • Experience: 3 years 4 months
November 2013 - Present Day
Procurement
Dealing with importation of petroleum(pms) products and other products the company requires via sea or air freight
Refreshed: Today
Power Engineer
Lagos • 9 August 1986 (30 years ) • Experience: 4 years 8 months
August 2015 - Present Day
Site Engineer
Installation of DCDB on site for upgrade in Lagos region. Installation of module and alarm boxes. Technical site survey for all IHS and MTN for colocation in lagos region.
Refreshed: Today
Sales
Rivers • 24 July 1978 (38 years ) • Experience: 5 years 1 month
April 2009 - April 2014
senior marketing executive
sale,service &manage insurance investment policies, recruit & train new emploees
Refreshed: Today
General Manager and Operations
Lagos • 27 July 1981 (35 years ) • Experience: 14 years
November 2013 - Present Day
Meeting and Event Coordinator
•Planing and organizing event and other hotel services. ●Promoting and Marketing the business ●Ensure events and Conferences run smoothly. ●Maintaining statistical and financial report. ●Setting and achieving sales and profit target.
Refreshed: Today
Human resource officer
Lagos • 1 May 1986 (30 years ) • Experience: 3 years 10 months
May 2013 - April 2014
Customer Service
Receiving visitors , calls , document collection and proper documentation ,e.t.c.
Refreshed: Yesterday
ENGINEER/MANGER
Rivers • 22 June 1970 (46 years ) • Experience: 16 years 10 months
August 2011 - September 2012
Technical /QA/QC Manager
1. Produce all relevant procedures, work instructions as required for clients operations 2. Supervise project planning and execution 3. Ensure projects are in line with procedures and work practices 4. Guarantee the technical accuracy of all reports
Refreshed: Yesterday
Telecommunication Engineer
Abuja • 28 September 1989 (27 years ) • Experience: 4 years 2 months
February 2016 - February 2017
Microwave Network Planning Engineer
-Planning and Designing microwave transmission network using Pathloss and iRiver design tools; -Performing capacity and frequency planning for low-level designs, and microwave frequency interference analysis; -Conducting microwave link configuration
Refreshed: Yesterday
Chemical/Process Engineer
Lagos • 30 December 1985 (31 years ) • Experience: 4 years
July 2015 - Present Day
Operations(Process) Engineer
• Quality assurance • Coordination of the Operation of six furnace Plants, the A.O.D refining plant, the CCM (Continuous Casting Machine) Plant and the Gas plant to ensure smooth and excellent Production by constant liaison with the Shifts-in-charge
Refreshed: Yesterday