Resume in Ebonyi. Resume Construction Manager.

Found 5 resumes

Manager, PS /mpbn / mpls planning
Ebonyi • 11 November 1985 (31 years ) • Experience: 8 years 6 months
December 2013 - Present Day
Bss Engineer
NodeB/GSM/GPRS/EDGE/2.5G/3.0G/3.5G/4.0G/Transmission (Installation, Commission, Testing and Integration, Operation and Maintenance, Site Acceptance, Documentations, Operation and Maintenance ,SurveillanceRadio Access Network Engineer/Transmission/Acc
Refreshed: 20 October 2014
Construction and secretary job
Ebonyi • 11 November 1982 (34 years ) • Experience: 2 years 11 months
July 2011 - May 2014
BUILDING CONTRACTOR
BUILDING SUPERVISOR
Refreshed: 19 May 2014
Project civil engineer/ site engineer/ construction engineer
Ebonyi • 5 September 1989 (27 years ) • Experience: 6 years
April 2011 - Present Day
It student
Preaparation of daily, weekly, monthly and quarterly Site reports, production of architectural drawings, structural drawings, and calculation of earthworks.
Refreshed: 7 January 2014
Construction
Ebonyi • 20 August 1985 (31 years ) • Experience: 5 years 1 month
January 2012 - Present Day
architect
i have been working with jmk and steve constraction company and i need a good job again
Refreshed: 1 November 2013
Construction engineer
Ebonyi • 1 January 1969 (48 years ) • Experience: 7 years 6 months
June 2012 - Present Day
construction site supervisor
· Clearing trees, brushes, removal of shrubs, vegetable soil and cart away to designate dump site. · Supervision of geotechnical survey or investigation of the proposed project site (for the confirmation of the soil bearing strata,
Refreshed: 14 October 2013

All resumes in the city:

Plant Control Room/ Electrical Operator
Ebonyi • 18 January 1983 (34 years ) • Experience: 11 years 6 months
August 2014 - Present Day
Power Plant Control Room/ Electrical Operator
Carry out pre-line up and line up checks before and after any plant maintenance. Adjust controls to generate specified electrical power, or to regulate the flow of power between generating stations and substations. Control generator output to matc
Refreshed: Today
Maintenance Planner/Scheduler
Ebonyi • 18 January 1983 (34 years ) • Experience: 10 years 11 months
August 2014 - Present Day
Control Room/ Electrical Operator
Carry out pre-line up and line up checks before and after any plant maintenance. Adjust controls to generate specified electrical power, or to regulate the flow of power between generating stations and substations. Control generator output to ma
Refreshed: 9 March
FPSO Field Operator
Ebonyi • 18 January 1983 (34 years ) • Experience: 10 years 11 months
August 2014 - Present Day
Control Room/ Electrical Operator
Carry out pre-line up and line up checks before and after any plant maintenance. Adjust controls to generate specified electrical power, or to regulate the flow of power between generating stations and substations. Control generator output to ma
Refreshed: 9 March
Field Support 6 Officer (Rivers)
Ebonyi • 18 January 1983 (34 years ) • Experience: 10 years 11 months
August 2014 - Present Day
Control Room/ Electrical Operator
Carry out pre-line up and line up checks before and after any plant maintenance. Adjust controls to generate specified electrical power, or to regulate the flow of power between generating stations and substations. Control generator output to ma
Refreshed: 9 March
INFORMATION TECHNOLOGY ADMINISTRATOR/ HEAD CREDIT IN BANKS
Ebonyi • 24 December 1984 (32 years ) • Experience: 2 years 6 months
November 2015 - May 2016
HEAD INFORMATION TECHNOLOGY
• Providing strategic guidance, leadership and direction in the execution of IT departmental functions. • Establishing and enforcing IT policies/procedures that guarantee confidentiality, integrity and availability of information. • Coordinating the
Refreshed: 2 March
Anyone that I CAN FIT IN
Ebonyi • 27 August 1983 (33 years ) • Experience: 5 years 2 months
January 2009 - February 2014
ANY JOB I CAN FIT IN
HAVE BEEN TEACHING AS A SENIOR SCIENCE TEACHER IN VARIOUS SECONDARY SCHOOLS IN NIGERIA.
Refreshed: 3 July 2015
Machine Operator
Ebonyi • 13 February 1992 (25 years ) • Experience: 1 year 1 month
November 2010 - November 2011
Machine Operator (Industrial Training)
Set up machines at the beginning of shift to ensure proper working order Perform testing procedures to ensure that machines work optimally during the production procedures Maintain and clean machines before and after each shift Feed information akin
Refreshed: 10 September 2014
Engineering Technician
Ebonyi • 13 February 1992 (25 years ) • Experience: 1 year 1 month
November 2010 - November 2011
Machine Operator (Industrial Training)
Set up machines at the beginning of shift to ensure proper working order Perform testing procedures to ensure that machines work optimally during the production procedures Maintain and clean machines before and after each shift Feed information akin
Refreshed: 10 September 2014
Indusrtrial chemist
Ebonyi • 15 July 1985 (31 years ) • Experience: 5 years 6 months
March 2014 - Present Day
Quality control
Conductive to team spirit, ability to without pressure of work and maintainance of high level of integrity
Refreshed: 7 May 2014
Computer operator
Ebonyi • 7 July 1984 (32 years ) • Experience: 4 years 5 months
November 2013 - February 2014
GRAPHICS DESIGNER, FINISHER, AND RIMING MANAGER
I HAVE MUCH EXPERIENCE IN COMPUTER, IN THAT I CAN MANAGER WHAT EVER AM BEEN ASK TO DO WITH THE COMPUTER SYSTEM
Refreshed: 4 February 2014