Resume in Abuja. Resume Plant Engineer.

Found 138 resumes

Civil Engineer
Abuja • 28 December 1982 (33 years ) • Experience: 3 years 9 months
October 2011 - January 2014
Site Engineer
I was in charge of construction, Supervision of construction works on Highland estate, along Abuja - keffi road,Auta baleife, Karu local government, Nasarawa state.
Refreshed: 7 November 2014
Team Lead
Abuja • 18 October 1982 (34 years ) • Experience: 5 years 10 months
April 2014 - September 2014
Senior Network Engineer
Network design and consult Design and installation of secure networks using checkpoint devices Manage a group of engineers Network access implementation using Cisco Secure Access Control Server (CSACS) URL filtering implementation Network security Po
Refreshed: 3 October 2014
Transmission Engineer
Abuja • 2 March 1983 (33 years ) • Experience: 11 years 3 months
September 2011 - Present Day
Field Maintenance Engineer, Etisalat (EMTS) project (JIGAWA)
Performing routine O&M procedures as prescribed for the Power, Transmission and BTS Radio networks Reacting to emergency faults and ensuring that all faults are rectified promptly within contracted SLA Ensuring provision of powerto all sites with
Refreshed: 10 September 2014
Engineer
Abuja • 2 March 1983 (33 years ) • Experience: 11 years 3 months
September 2011 - Present Day
Field Maintenance Engineer, Etisalat (EMTS) project (JIGAWA)
Performing routine O&M procedures as prescribed for the Power, Transmission and BTS Radio networks Reacting to emergency faults and ensuring that all faults are rectified promptly within contracted SLA Ensuring provision of powerto all sites with
Refreshed: 10 September 2014
Support Engineer
Abuja • 22 April 1985 (31 years ) • Experience: 6 years 3 months
June 2013 - Present Day
Field services Manager
V-SAT installation, maintenance/supervision, Network administration/ trouble shooting and management. LAN Cable Installation and supervision (Cable Trunking/termination,mounting of switches/hub racks, network phase plates such as phone jacks and lan
Refreshed: 26 August 2014
Maintenance Engineer In Telecom And Electronics
Abuja • 13 June 1968 (48 years ) • Experience: 30 years 6 months
March 2013 - Present Day
Plant Head
Production, maintenance vendor management, planning, man management.
Refreshed: 12 August 2014
Electrical engineer
Abuja • 6 June 1987 (29 years ) • Experience: 5 years 6 months
July 2014 - Present Day
ENGINEER
Electrical/Electronic Engineer Electrical Department; Project Handled: Absolute Project/Street light maintenance.
Refreshed: 24 April 2014
Plant Engineer
Abuja • 23 August 1982 (34 years ) • Experience: 9 years 10 months
December 2006 - Present Day
Electrical Technologist
I reported to the plant engineer, I oversee the Electrical section in the technical department which involve the maintenance department and the production department.
Refreshed: 25 November 2015
Engineer
Abuja • 3 April 1984 (32 years ) • Experience: 10 years
January 2012 - Present Day
Project Engineer
Supervision of Earth works Construction of line drains, culvert, laybyes, walk way, median kerbs, round abouts, car parks and bus shelters. Asphalt overlay works.
Refreshed: 19 October 2015
Civil/structural engineer
Abuja • 3 October 1980 (36 years ) • Experience: 8 years 1 month
February 2014 - Present Day
Principal Civil/Structural Engineer
Supervision of a 54 km road network Bida-Sacchi-Nupeko-Patigi road
Refreshed: 4 September 2015
Computer engineer
Abuja • 28 April 1988 (28 years ) • Experience: 8 years 8 months
June 2014 - Present Day
Computer Instructor/System Enginer
Training/instructing the industrial student on hard ware,software,troubleshooting and networking
Refreshed: 12 June 2015
IT/ enginner
Abuja • 28 April 1988 (28 years ) • Experience: 6 years 1 month
September 2012 - January 2014
system/Network Admin
Implimentation of first layer networking n Network termination
Refreshed: 9 June 2015
Civil engineer
Abuja • 11 January 1953 (63 years ) • Experience: 29 years 2 months
April 2010 - April 2011
Civil Engineer, Quantity Surveyor, Consultant
As QS making Invoices, Bills of Quantities and Linear Schedules for labor, mechanization and construction works. Construction supervision for the construction of 3- and 4-storey residential buildings of reinforced Concrete monolith.
Refreshed: 26 May 2015
Power plant operators
Abuja • 25 March 1982 (34 years ) • No experience
Refreshed: 4 May 2015
Pipeline project engineer with over 9 yrs experenice in oil&gas
Abuja • 26 January 1980 (36 years ) • Experience: 10 years 10 months
October 2012 - Present Day
Project Engineer- NPDC OML 42 Re-Entry Project
Project Engineer- NESTOIL PLC, NPDC OML 42 Re-Entry Project: 8”X 1.6km-Export Manifold, 16”X 36km jones creek to egwa 1- Export Manifold, 20”X 9.5 km Odidi 2 Manifold- Keremo Manifold, 24”X5.55km CPF to ELPS, 2”X 67.96 km Gas Flowlines Jones Creek, 4
Refreshed: 25 March 2015