Resume in Abuja. Resume Power.

Found 16 resumes

Electrical Engineer
Abuja • 21 December 1982 (33 years ) • Experience: 5 years 3 months
September 2011 - Present Day
Power System Engineer
Design power system facilities and equipment and coordinates construction, operation, and maintenance of electric power generating, receiving, and distribution stations, transmission lines, and distribution systems and equipment: design and plan layo
Refreshed: 29 October 2015
Installation/maintenance technician
Abuja • 27 October 1963 (53 years ) • Experience: 14 years 4 months
February 2008 - Present Day
TECHNICIAN (POWER/TELECOM TRANMISSION ENGINEERING)-TECHNICAL SUPPORT SERVICES.
1. Maintenance of power supply system of the entire Abuja network, such as the installation and maintenance of generators from 10 – 350KVA, power backup systems – rectifiers and backup batteries, Ups of about 60KVA. 2. Rigging activities for the ins
Refreshed: 15 May 2015
Power plant operators
Abuja • 25 March 1982 (34 years ) • No experience
Refreshed: 4 May 2015
Power plant operator
Abuja • 18 October 1983 (33 years ) • Experience: 5 years 9 months
May 2013 - Present Day
Duty Engineer
Responsibilities: Dish Installation & Configuration Dish Tracking Equipment Maintenance Signal Monitoring and All other duties as assigned by my supervisor.
Refreshed: 19 February 2015
Oil and gas/power and energy/engineering
Abuja • 27 January 1992 (24 years ) • Experience: 4 years 9 months
September 2012 - Present Day
Director
As a director of a Secondary School, I ensure that every activities carried out in the school is as instructed by the ministry of education and that the teachers meet up their requirement standard ensuring that the students get the best of knowledg
Refreshed: 22 December 2014
Sales engineer, power product
Abuja • 12 March 1978 (38 years ) • Experience: 9 years 2 months
November 2013 - November 2014
NAPTIN TRAINEE ENGINEER
Carry out tests on power and distribution transformers (Ratio, excitation, insulation resistance, transformer oil and short-circuit tests).Monitoring and maintenance of metering scheme.Perform pre-commissioning tests on distribution substations.Maint
Refreshed: 2 December 2014
Sales engineer(power systems)
Abuja • 10 October 1972 (44 years ) • Experience: 3 years 8 months
February 2013 - Present Day
Principal Engineer
1. Supervision of the installation and implementation of single and three phase prepayment meters in Imo State for EEDC under the CAPMI scheme in line with the approved standards. 2. Supervision of the NIPP project for the 50KVA, 33/11/0.415KV CSP/HV
Refreshed: 27 November 2014
Field technician (installation/maintenance)
Abuja • 27 October 1963 (53 years ) • Experience: 14 years 3 months
February 2008 - Present Day
TECHNICIAN (POWER/TELECOM TRANMISSION ENGINEERING)-TECHNICAL SUPPORT SERVICES.
1. Maintenance of power supply system of the entire Abuja network, such as the installation and maintenance of generators from 10 – 350KVA, power backup systems – rectifiers and backup batteries, Ups of about 60KVA. 2. Rigging activities for the ins
Refreshed: 31 October 2014
Electricak engineee
Abuja • 16 July 1989 (27 years ) • Experience: 4 years
January 2013 - Present Day
power diatribution
I was trained on power distribution,substation manag ement, testing planning operation and maintenance
Refreshed: 10 January 2014
Power engineering
Abuja • 8 July 1981 (35 years ) • No experience
Refreshed: 23 November 2013
Power holding company of nigeria
Abuja • 5 October 1987 (29 years ) • Experience: 1 year 5 months
January 2013 - October 2013
Power Holding Company of nigeria
incharge of Enumeration of Their customers
Refreshed: 29 October 2013
Electrical power engineer
Abuja • 24 February 1984 (32 years ) • Experience: 6 years 2 months
September 2010 - November 2011
MASTERS RESEARCH GRADUATE
EFFECTIVELY RESEARCHED SOME OF THE METHODS (TO DETERMINE THE BEST ONES) USED IN TRANSMITTING ELECTRICAL POWER ACROSS ANY POWER NETWORK OR TRANSMISSION LINE WITHOUT OVERLOADING THE SYSTEM. CAME UP WITH 5 METHODS OF DOING THIS BUT CONCLUDED WITH THE 3
Refreshed: 10 April 2013
Power plant operator
Abuja • 18 June 1968 (48 years ) • Experience: 27 years 5 months
October 2006 - April 2013
control room engineer
Operates safely,reliably and efficiently a 135mw power plant (3 GE LM6000 sprint Gas turbines) for cement production. Responsiblities include; prestart checks, starting,stoping,synchronization, parameters monitoring, regular loggings/evaluations,fau
Refreshed: 8 April 2013
Instrumentation and control
Abuja • 2 June 1979 (37 years ) • Experience: 7 years 11 months
March 2012 - Present Day
Customer Technical Support (Scottish Power)
 Responding to customers queries, request and inquiries  Tasked with introducing new products and services to customers.  Regularly managing and updating of customers energy consumption  Arranging technical visits for customers
Refreshed: 7 April 2013
Rehabilitation engineer
Abuja • 21 July 1980 (36 years ) • Experience: 3 years 8 months
March 2007 - October 2010
power machine installation and maintenance engineer
Example: Responsibilities: Selling ad space on the site hobatoba.com Preparation of accounting records Achievements: Increased sales by 10% in the first half of 2011
Refreshed: 4 April 2013