Resume in Cross River. Resume Technologist.

Found 17 resumes

Graduate trainee
Cross River • 2 October 1988 (28 years ) • Experience: 15 years 5 months
August 2010 - October 2012
LAB. Technologist
Performing of Medical Laboratory Tests. (Health Information)
Refreshed: 9 April 2015
Electrical technician
Cross River • 8 August 1979 (37 years ) • No experience
September 2005 - June 1999
Electrical Technologist
Tutor: 1) Practial courses on Domestic and Industrial Installations; electrical surface, trunking and conduit wiring with reference to IEE Regulation and standards. 2) Carry out Insulation Resistance Test, continuity Test, Test of effectiveness of e
Refreshed: 31 March 2015
Mechanical engineering technologist
Cross River • 12 October 1987 (29 years ) • Experience: 4 months
September 2006 - December 2006
Operation Technician
• While with First Medical and Sterile Products (FMSP), EPZ Calabar; as a production technician in the injection molding unit, i was exposed to the operations of High Sensitive injection molding machines used for production of Syringes. While with th
Refreshed: 16 March 2015
Graduate trainee
Cross River • 5 March 1982 (34 years ) • Experience: 5 years 9 months
February 2011 - Present Day
Mechanical Technologist
i. Ensuring optimum plant performance ii. Ensuring routine checks/maintenance on all equipments/machines iii. Ensuring that reports are logged at the end of work carried out iv. Liaising with other sections and departments
Refreshed: 12 February 2015
Heavy duty mechanic
Cross River • 21 May 1980 (36 years ) • Experience: 7 years 6 months
November 2012 - Present Day
Power Plant Technologist/ Head of Unit
Handle all repairs on Power plant generators to ensure un-interupted power supply. Others heavy duty equipment inclusive.
Refreshed: 11 November 2014
Lab technogolist
Cross River • 13 September 1988 (28 years ) • Experience: 5 years 9 months
February 2011 - Present Day
LAB TECHNOLOGIST
 Assist the lab manager in general analysis and sterilizations of lab equipments Prepares growth media and produced necessary results in microbiology and serve as a quality control officer of batches of pharmaceuticals products, water sampling, air
Refreshed: 18 October 2014
Medical representative
Cross River • 13 September 1988 (28 years ) • Experience: 5 years 8 months
February 2011 - Present Day
LAB TECHNOLOGIST
 Assist the lab manager in general analysis and sterilizations of lab equipments Prepares growth media and produced necessary results in microbiology and serve as a quality control officer of batches of pharmaceuticals products, water sampling, air
Refreshed: 18 October 2014
Receptionist
Cross River • 4 September 1984 (32 years ) • Experience: 1 year 11 months
January 2006 - November 2007
Food Technologist
As a quality control personnel,am in charge of ensuring foods are served in the most hygenic conditions.
Refreshed: 22 September 2014
Technologist
Cross River • 5 February 1985 (31 years ) • Experience: 7 months
April 2010 - October 2010
information and computer technology
Monitoring transmission equipments. Installation of computers and electrical gadgets. Mounting of satellite dishes
Refreshed: 23 April 2014
Textilist
Cross River • 31 July 1989 (27 years ) • Experience: 7 months
August 2010 - February 2011
textile technologist
Preparation of mesh for printing,preparing yarns for spinning.
Refreshed: 3 April 2014
Electrical Engineer
Cross River • 8 August 1979 (37 years ) • No experience
September 2005 - June 1999
Electrical Technologist
Tutor: 1) Practial courses on Domestic and Industrial Installations; electrical surface, trunking and conduit wiring with reference to IEE Regulation and standards. 2) Carry out Insulation Resistance Test, continuity Test, Test of effectiveness of e
Refreshed: 25 February 2014
Physics electronics aand computer technologist
Cross River • 7 April 1986 (30 years ) • Experience: 1 year 1 month
January 2013 - January 2014
physics and computer operator and engineer
siesmic data processing and an operator of tapes data(computer operator and administrator)....maintenance of pipeline and repair of induction motors that are used in pumping AGO and PMS while i was working with PPMC
Refreshed: 20 January 2014
Lab. technologist
Cross River • 7 August 1991 (25 years ) • Experience: 8 months
August 2011 - March 2012
Lab. Technologist
parasitological analysis
Refreshed: 9 January 2014
Laboratory technologist
Cross River • 7 August 1991 (25 years ) • Experience: 8 months
August 2011 - March 2012
Lab. Technologist
parasitological analysis
Refreshed: 9 January 2014
Laboratory technologist
Cross River • 19 September 1985 (31 years ) • Experience: 3 years
November 2013 - Present Day
laboratory technologist
i live in akwa ibom
Refreshed: 23 October 2013